    261261|| 6.1 || - || - || 10m (approx 30ft) outdoor power cable, two conductors, 12AWG, rated for outdoor use, with [http://www.mouser.com/ProductDetail/Hirose-Electric/JR25WP-4S71/?qs=XQjbzJWzFPXdY8jaH9VFFw%3d%3d ODU Circular Connector], soldered onto cable || 1 || - || - || - ||
    262262|| 6.2 || Mouser:  Hirose || JR25WP-4S71 || [http://www.mouser.com/ProductDetail/Hirose-Electric/JR25WP-4S71/?qs=XQjbzJWzFPXdY8jaH9VFFw%3d%3d ODU Circular Connector] || 1 || - || - || - ||
    263 || 6.3 || - || - || Additional outdoor power cable, as needed, two conductors, 12AWG, rated for outdoor use, to extend from roof down to indoor testbed equipment room || ? || - || - || - ||
     263|| 6.3 || - || - || Additional outdoor power cable, as needed, two conductors, 12AWG, rated for outdoor use, to extend from roof down to indoor testbed equipment room || 1 || - || - || - ||
    264264|| 7.1 || - || - || 10m (approx 30ft) indoor power cable, two conductors, 10AWG, with one [http://www.mouser.com/ProductDetail/Tyco-Electronics-AMP/1-917807-2/?qs=sGAEpiMZZMufdu5QM0tCwRkkU7pYPyzb IDU Rectangular Power Connector] and four [http://www.mouser.com/ProductDetail/Tyco-Electronics/316041-2/?qs=vsAvTP%252bC%252bzGB86TzaaMK%252bA%3d%3d IDU Rectangular Power Connector Contacts ], two for each of the positive and negative DC power rails, crimped onto cable with a special tool, or soldered. || 1 || - || - || - ||
    265265|| 7.2 || Mouser:  Tyco/Amp || 1-917807-2 || [http://www.mouser.com/ProductDetail/Tyco-Electronics-AMP/1-917807-2/?qs=sGAEpiMZZMufdu5QM0tCwRkkU7pYPyzb IDU Rectangular Power Connector] || 1 || - || - || - ||
     
    275275       
    276276|| Item || Supplier || Part No || Description || Qty || Cost Each || Cost Total || Note ||
    277 || 9.1 || - || - || Outdoor site, with pole for mounting of antenna and Base Station Outdoor Unit, grounded to building ground for lightening protection || 1 || - || - || In some locales, the installation and grounding will need to be certified by a professional engineer ||
     277|| 9.1 || - || - || Outdoor site, with pole for mounting of antenna and Base Station Outdoor Unit, grounded to building ground for lightening protection || 1 || - || - || IMPORTANT:  In some locales, the installation and grounding will need to be certified by a professional engineer ||
    278278|| 9.2 || - || - || Pole for mounting of antenna and Base Station Outdoor Unit || 1 || - || - || Pole diameter between 48mm and 120mm ||
    279279|| 9.3 || - || - || Ground cable, as needed. || 1 || - || - ||  - ||
    280280|| 10.1 || Mouser:  Mean Well || SP-240-48 || Power supply for ODU, Mean Well [http://www.mouser.com/ProductDetail/Mean-Well/SP-240-48/?qs=sGAEpiMZZMu0oxGuRuNKH0QVy%252bJkdvy3pTeB%252b96yGok%3d SP-200-48], 110VAC input,  -48VDC output, rated 4.2A or 200W, mounted in testbed equipment room, or outdoors on roof, in weathertight enclosure (see UMass Amherst) || 1 || - || - || - ||
    281 || 10.2 || - || - || As needed, one weatherproof container on roof, to mount ODU power supply. || ? || - || - || see UMass Amherst ||
     281|| 10.2 || - || - || When available, one weatherproof container on roof, to mount ODU power supply. || 0 - 1 || - || - || See UMass Amherst for typical design. ||
    282282|| 11.1 || - || - || Indoor site, with racks, for mounting of Base Station Indoor Unit and Linux Servers || 1 || - || - ||  - ||
    283283|| 11.2 || Mouser:  Mean Well || SP-320-48 || Power supply for IDU, Mean Well [http://www.mouser.com/ProductDetail/Mean-Well/SP-320-48/?qs=vSyGtvivC8zwzazZzxeJ9g%3d%3d SP-320-48], 110VAC input,  -48VDC output, rated 6.7A or 320W, mounted in testbed equipment room || 1 || - || - ||  - ||
    284284|| 11.3 || - || - || Servers, for loading with ASN-GW and ORBIT Mangement Framework software, for final operating configuration || 0 - 3 || 1,600 || 0 - 4,800 ||  Depends on final configuration ||
    285 || 11.4 || - || - || Ethernet switch ports for multiple VLANs || - || - || 0 - 2,500 ||  OpenFlow compatible switch desired;  PC-based design underway that utilizes FPGA card, total value:  $1300 + $400 = $1700  ||
     285|| 11.4 || - || - || Ethernet switch ports, for multiple VLANs || - || - || 0 - 2,500 ||  OpenFlow compatible switch desired.  PC-based design underway that utilizes FPGA card, total cost:  $1300 + $400 = $1700  ||
    286286
    287287
     
    299299|| Release ||  Features  || Released || Delivered || Where || Note ||
    300300|| v1.0  ||   -  ||  Plan 10/1/09 (Spiral 1) ||  -  ||  Rutgers WINLAB  ||  For first demos and experiments  ||
    301 || v2.0 (GBSN v3.0)  ||   -  ||  Plan 7/15/10 (Spiral 2) ||  -  ||  -  ||  For use in first delivered kits  ||
     301|| v2.0 (GBSN v3.0)  ||   -  ||  Plan 7/15/10 (Spiral 2) ||  -  ||  -  ||  For use with first delivered kits  ||
    302302|| v2.1 (GBSN v3.1)  ||   -  ||  Plan 11/2010  (Spiral 3)  ||  -  ||  -  ||  -  ||
    303303|| v2.2 (GBSN v3.2)  ||   -  ||  (Spiral 4)  ||  -  ||  -  ||  -  ||
     
    312312
    313313
    314 The second sets of kit hardware were ordered in 2009 and will be delivered in 2010, as part of Spiral 2:  [[BR]]
     314The second sets of kit hardware were ordered in 2009 and will be delivered in 2010 and 2011, as part of Spirals 2 and 3.  [[BR]]
     315
     316Issue:  It has been planned that three kits will be delivered during Spiral 2 (7/1/10), and the remaining four during Spiral 3.  It has been planned that the first three kits will be delivered to campuses/sites where there is easy access for support, i.e., at nearby locations: NEC Labs America, Columbia University, and Polytechnic Institute of NYU.  However, it would also make sense to deliver a kit ONLY when the campus/site has received an FCC license, and is ready to install the kit.  Thus, the delivery sequence may also depend on campus status.
    315317
    316318|| Kit ||  Ordered  ||  Received  ||  Integrated  || Delivered  ||  Where  ||  Note  ||
    317 || 2.1  ||   12/17/09  ||  plan 5/15/10  ||  ?  || ?  || NEC Labs America   ||  ?  ||
    318 || 2.2  ||   12/17/09  ||  plan 5/15/10  ||  ?  || ?  || Columbia University  ||  ?  ||
    319 || 2.3  ||   12/17/09  ||  plan 5/15/10  ||  ?  || ?  || Polytechnic Institute of NYU  ||  ?  ||
    320 || 2.4  ||   12/17/09  ||  plan 5/15/10  ||  ?  || ?  || UCLA  ||  ?  ||
    321 || 2.5  ||   12/17/09  ||  plan 5/15/10  ||  ?  || ?  || University of Colorado at Boulder  ||  ?  ||
    322 || 2.6  ||   12/17/09  ||  plan 5/15/10  ||  ?  || ?  || UMass Amherst  ||  ?  ||
    323 || 2.7  ||   12/17/09  ||  plan 5/15/10  ||  ?  || ?  || University of Wisconsin  ||  ?  ||
    324 
    325 Issue:  It has been planned that three kits will be delivered during Spiral 2, and the remaining four during Spiral 3.  It has been planned that the first three kits will be delivered to campuses/sites where there is easy access for support, i.e., at nearby locations: NEC Labs America, Columbia University, and Polytechnic Institute of NYU.  However, it would also make sense to deliver a kit ONLY when the campus/site has received an FCC license, and is ready to install the kit.  Thus, the delivery sequence may also depend on campus status.
    326  
     319|| 2.1  ||   12/17/09  ||  plan 5/15/10  ||  ?  || Spiral 2 (7/1/10)  || NEC Labs America   ||  ?  ||
     320|| 2.2  ||   12/17/09  ||  plan 5/15/10  ||  ?  || Spiral 2 (7/1/10)  || Columbia University  ||  ?  ||
     321|| 2.3  ||   12/17/09  ||  plan 5/15/10  ||  ?  || Spiral 2 (7/1/10)  || Polytechnic Institute of NYU  ||  ?  ||
     322|| 2.4  ||   12/17/09  ||  plan 5/15/10  ||  ?  || Spiral 3  || UCLA  ||  ?  ||
     323|| 2.5  ||   12/17/09  ||  plan 5/15/10  ||  ?  || Spiral 3  || University of Colorado at Boulder  ||  ?  ||
     324|| 2.6  ||   12/17/09  ||  plan 5/15/10  ||  ?  || Spiral 3  || UMass Amherst  ||  ?  ||
     325|| 2.7  ||   12/17/09  ||  plan 5/15/10  ||  ?  || Spiral 3  || University of Wisconsin  ||  ?  ||
     326
    327327It is expected that a third sets of kit hardware will be ordered in 3/2010 and will be delivered in ?, for those campuses not included in the Spiral 2 projects, or for campuses that want to install additional kits.  [[BR]]
    328328
    329329|| Kit ||  Ordered  ||  Received  ||  Integrated  || Delivered  ||  Where  ||  Note  ||
    330 || 3.1  ||   3/10  ||  ?  ||  ?  || ?  || BBN Technologies  ||  ?  ||
     330|| 3.1  ||   3/10  ||  ?  ||  ?  || ?  || BBN Technologies  ||  Could a kit from the second set be delivered for use until this kit is received?  ||
    331331|| 3.2  ||   3/10  ||  ?  ||  ?  || ?  || University of Wisconsin, 2nd site?  ||  ?  ||
    332332|| 3.3  ||   3/10  ||  ?  ||  ?  || ?  || ?  ||  ?  ||