Changes between Version 130 and Version 131 of WiMAXInteg
- Timestamp:
- 02/17/10 09:02:41 (15 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
WiMAXInteg
v130 v131 261 261 || 6.1 || - || - || 10m (approx 30ft) outdoor power cable, two conductors, 12AWG, rated for outdoor use, with [http://www.mouser.com/ProductDetail/Hirose-Electric/JR25WP-4S71/?qs=XQjbzJWzFPXdY8jaH9VFFw%3d%3d ODU Circular Connector], soldered onto cable || 1 || - || - || - || 262 262 || 6.2 || Mouser: Hirose || JR25WP-4S71 || [http://www.mouser.com/ProductDetail/Hirose-Electric/JR25WP-4S71/?qs=XQjbzJWzFPXdY8jaH9VFFw%3d%3d ODU Circular Connector] || 1 || - || - || - || 263 || 6.3 || - || - || Additional outdoor power cable, as needed, two conductors, 12AWG, rated for outdoor use, to extend from roof down to indoor testbed equipment room || ?|| - || - || - ||263 || 6.3 || - || - || Additional outdoor power cable, as needed, two conductors, 12AWG, rated for outdoor use, to extend from roof down to indoor testbed equipment room || 1 || - || - || - || 264 264 || 7.1 || - || - || 10m (approx 30ft) indoor power cable, two conductors, 10AWG, with one [http://www.mouser.com/ProductDetail/Tyco-Electronics-AMP/1-917807-2/?qs=sGAEpiMZZMufdu5QM0tCwRkkU7pYPyzb IDU Rectangular Power Connector] and four [http://www.mouser.com/ProductDetail/Tyco-Electronics/316041-2/?qs=vsAvTP%252bC%252bzGB86TzaaMK%252bA%3d%3d IDU Rectangular Power Connector Contacts ], two for each of the positive and negative DC power rails, crimped onto cable with a special tool, or soldered. || 1 || - || - || - || 265 265 || 7.2 || Mouser: Tyco/Amp || 1-917807-2 || [http://www.mouser.com/ProductDetail/Tyco-Electronics-AMP/1-917807-2/?qs=sGAEpiMZZMufdu5QM0tCwRkkU7pYPyzb IDU Rectangular Power Connector] || 1 || - || - || - || … … 275 275 276 276 || Item || Supplier || Part No || Description || Qty || Cost Each || Cost Total || Note || 277 || 9.1 || - || - || Outdoor site, with pole for mounting of antenna and Base Station Outdoor Unit, grounded to building ground for lightening protection || 1 || - || - || I n some locales, the installation and grounding will need to be certified by a professional engineer ||277 || 9.1 || - || - || Outdoor site, with pole for mounting of antenna and Base Station Outdoor Unit, grounded to building ground for lightening protection || 1 || - || - || IMPORTANT: In some locales, the installation and grounding will need to be certified by a professional engineer || 278 278 || 9.2 || - || - || Pole for mounting of antenna and Base Station Outdoor Unit || 1 || - || - || Pole diameter between 48mm and 120mm || 279 279 || 9.3 || - || - || Ground cable, as needed. || 1 || - || - || - || 280 280 || 10.1 || Mouser: Mean Well || SP-240-48 || Power supply for ODU, Mean Well [http://www.mouser.com/ProductDetail/Mean-Well/SP-240-48/?qs=sGAEpiMZZMu0oxGuRuNKH0QVy%252bJkdvy3pTeB%252b96yGok%3d SP-200-48], 110VAC input, -48VDC output, rated 4.2A or 200W, mounted in testbed equipment room, or outdoors on roof, in weathertight enclosure (see UMass Amherst) || 1 || - || - || - || 281 || 10.2 || - || - || As needed, one weatherproof container on roof, to mount ODU power supply. || ? || - || - || see UMass Amherst||281 || 10.2 || - || - || When available, one weatherproof container on roof, to mount ODU power supply. || 0 - 1 || - || - || See UMass Amherst for typical design. || 282 282 || 11.1 || - || - || Indoor site, with racks, for mounting of Base Station Indoor Unit and Linux Servers || 1 || - || - || - || 283 283 || 11.2 || Mouser: Mean Well || SP-320-48 || Power supply for IDU, Mean Well [http://www.mouser.com/ProductDetail/Mean-Well/SP-320-48/?qs=vSyGtvivC8zwzazZzxeJ9g%3d%3d SP-320-48], 110VAC input, -48VDC output, rated 6.7A or 320W, mounted in testbed equipment room || 1 || - || - || - || 284 284 || 11.3 || - || - || Servers, for loading with ASN-GW and ORBIT Mangement Framework software, for final operating configuration || 0 - 3 || 1,600 || 0 - 4,800 || Depends on final configuration || 285 || 11.4 || - || - || Ethernet switch ports for multiple VLANs || - || - || 0 - 2,500 || OpenFlow compatible switch desired; PC-based design underway that utilizes FPGA card, total value: $1300 + $400 = $1700 ||285 || 11.4 || - || - || Ethernet switch ports, for multiple VLANs || - || - || 0 - 2,500 || OpenFlow compatible switch desired. PC-based design underway that utilizes FPGA card, total cost: $1300 + $400 = $1700 || 286 286 287 287 … … 299 299 || Release || Features || Released || Delivered || Where || Note || 300 300 || v1.0 || - || Plan 10/1/09 (Spiral 1) || - || Rutgers WINLAB || For first demos and experiments || 301 || v2.0 (GBSN v3.0) || - || Plan 7/15/10 (Spiral 2) || - || - || For use infirst delivered kits ||301 || v2.0 (GBSN v3.0) || - || Plan 7/15/10 (Spiral 2) || - || - || For use with first delivered kits || 302 302 || v2.1 (GBSN v3.1) || - || Plan 11/2010 (Spiral 3) || - || - || - || 303 303 || v2.2 (GBSN v3.2) || - || (Spiral 4) || - || - || - || … … 312 312 313 313 314 The second sets of kit hardware were ordered in 2009 and will be delivered in 2010, as part of Spiral 2: [[BR]] 314 The second sets of kit hardware were ordered in 2009 and will be delivered in 2010 and 2011, as part of Spirals 2 and 3. [[BR]] 315 316 Issue: It has been planned that three kits will be delivered during Spiral 2 (7/1/10), and the remaining four during Spiral 3. It has been planned that the first three kits will be delivered to campuses/sites where there is easy access for support, i.e., at nearby locations: NEC Labs America, Columbia University, and Polytechnic Institute of NYU. However, it would also make sense to deliver a kit ONLY when the campus/site has received an FCC license, and is ready to install the kit. Thus, the delivery sequence may also depend on campus status. 315 317 316 318 || Kit || Ordered || Received || Integrated || Delivered || Where || Note || 317 || 2.1 || 12/17/09 || plan 5/15/10 || ? || ? || NEC Labs America || ? || 318 || 2.2 || 12/17/09 || plan 5/15/10 || ? || ? || Columbia University || ? || 319 || 2.3 || 12/17/09 || plan 5/15/10 || ? || ? || Polytechnic Institute of NYU || ? || 320 || 2.4 || 12/17/09 || plan 5/15/10 || ? || ? || UCLA || ? || 321 || 2.5 || 12/17/09 || plan 5/15/10 || ? || ? || University of Colorado at Boulder || ? || 322 || 2.6 || 12/17/09 || plan 5/15/10 || ? || ? || UMass Amherst || ? || 323 || 2.7 || 12/17/09 || plan 5/15/10 || ? || ? || University of Wisconsin || ? || 324 325 Issue: It has been planned that three kits will be delivered during Spiral 2, and the remaining four during Spiral 3. It has been planned that the first three kits will be delivered to campuses/sites where there is easy access for support, i.e., at nearby locations: NEC Labs America, Columbia University, and Polytechnic Institute of NYU. However, it would also make sense to deliver a kit ONLY when the campus/site has received an FCC license, and is ready to install the kit. Thus, the delivery sequence may also depend on campus status. 326 319 || 2.1 || 12/17/09 || plan 5/15/10 || ? || Spiral 2 (7/1/10) || NEC Labs America || ? || 320 || 2.2 || 12/17/09 || plan 5/15/10 || ? || Spiral 2 (7/1/10) || Columbia University || ? || 321 || 2.3 || 12/17/09 || plan 5/15/10 || ? || Spiral 2 (7/1/10) || Polytechnic Institute of NYU || ? || 322 || 2.4 || 12/17/09 || plan 5/15/10 || ? || Spiral 3 || UCLA || ? || 323 || 2.5 || 12/17/09 || plan 5/15/10 || ? || Spiral 3 || University of Colorado at Boulder || ? || 324 || 2.6 || 12/17/09 || plan 5/15/10 || ? || Spiral 3 || UMass Amherst || ? || 325 || 2.7 || 12/17/09 || plan 5/15/10 || ? || Spiral 3 || University of Wisconsin || ? || 326 327 327 It is expected that a third sets of kit hardware will be ordered in 3/2010 and will be delivered in ?, for those campuses not included in the Spiral 2 projects, or for campuses that want to install additional kits. [[BR]] 328 328 329 329 || Kit || Ordered || Received || Integrated || Delivered || Where || Note || 330 || 3.1 || 3/10 || ? || ? || ? || BBN Technologies || ? ||330 || 3.1 || 3/10 || ? || ? || ? || BBN Technologies || Could a kit from the second set be delivered for use until this kit is received? || 331 331 || 3.2 || 3/10 || ? || ? || ? || University of Wisconsin, 2nd site? || ? || 332 332 || 3.3 || 3/10 || ? || ? || ? || ? || ? ||