Changes between Version 119 and Version 120 of WiMAXInteg
- Timestamp:
- 02/16/10 12:34:42 (14 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
WiMAXInteg
v119 v120 122 122 As part of the Spiral 1 WiMAX D&P prject, two WiMAX campus deployment kits were purchased for: 123 123 Rutgers, WINLAB[[BR]] 124 Rutgers, Bush Campus [[BR]] 125 126 The WiMAX Kit Project (1753) is purchasing and supplying WiMAX campus deployment kits to the following campuses. In addition, it is providing a limited number of client platform kits. 124 127 NEC Labs America [[BR]] 125 126 The WiMAX Kit Project (1753) is purchasing and supplying WiMAX campus deployment kits to the following campuses. In addition, it is providing a limited number of client platform kits.127 Rutgers, Bush Campus [[BR]]128 128 Columbia University [[BR]] 129 129 Polytechnic Institute of NYU[[BR]] … … 264 264 || 8.1 || - || - || Server, loaded with ASN-GW and ORBIT Management Framework software, for use during installation and initial checkout, and perhaps for final operating configuration || 1 || - || - || - || 265 265 266 The following tools will be provided on-loan by Rutgers WINLAB to campuses, for use in crimpingpower connectors:266 The following tools will be provided on-loan to campuses by Rutgers WINLAB, for use with Tyco/Amp power connectors: 267 267 [http://search.digikey.com/scripts/DkSearch/dksus.dll?lang=en&site=US&WT.z_homepage_link=hp_go_button&KeyWords=234171-1&x=14&y=18 Crimping tool for D-5 Series] [[BR]] 268 268 [http://search.digikey.com/scripts/dksearch/dksus.dll?pname&site=us&lang=en&wt.mc_id=Dxn_US_US2010_Catlink&name=A32487-ND Pin extraction tool for D-5 Series] [[BR]] … … 275 275 || 9.2 || - || - || Pole for mounting of antenna and Base Station Outdoor Unit || 1 || - || - || - || 276 276 || 9.3 || - || - || Ground cable, as needed. || 1 || - || - || - || 277 || 10.1 || Mouser: Mean Well || SP-240-48 || Power supply for ODU, Mean Well [http://www.mouser.com/ProductDetail/Mean-Well/SP-240-48/?qs=sGAEpiMZZMu0oxGuRuNKH0QVy%252bJkdvy3pTeB%252b96yGok%3d SP-200-48], 110VAC input, -48VDC output, rated 4.2A or 200W, mounted in testbed equipment room, or outdoors on roof, in weathertight enclosure (see UMass Amherst) || 1 || - || - || - ||277 || 10.1 || Mouser: Mean Well || SP-240-48 || Power supply for ODU, Mean Well [http://www.mouser.com/ProductDetail/Mean-Well/SP-240-48/?qs=sGAEpiMZZMu0oxGuRuNKH0QVy%252bJkdvy3pTeB%252b96yGok%3d SP-200-48], 110VAC input, -48VDC output, rated 4.2A or 200W, mounted in testbed equipment room, or outdoors on roof, in weathertight enclosure (see UMass Amherst) || 1 || - || - || - || 278 278 || 10.2 || - || - || As needed, one weatherproof container on roof, to mount ODU power supply. || ? || - || - || see UMass Amherst || 279 279 || 11.1 || - || - || Indoor site, with racks, for mounting of Base Station Indoor Unit and Linux Servers || 1 || - || - || - || 280 || 11.2 || Mouser: Mean Well || SP-320-48 || Power supply for IDU, Mean Well [http://www.mouser.com/ProductDetail/Mean-Well/SP-320-48/?qs=vSyGtvivC8zwzazZzxeJ9g%3d%3d SP-320-48], 110VAC input, -48VDC output, rated 6.7A or 320W, mounted in testbed equipment room || 1 || - || - || - ||280 || 11.2 || Mouser: Mean Well || SP-320-48 || Power supply for IDU, Mean Well [http://www.mouser.com/ProductDetail/Mean-Well/SP-320-48/?qs=vSyGtvivC8zwzazZzxeJ9g%3d%3d SP-320-48], 110VAC input, -48VDC output, rated 6.7A or 320W, mounted in testbed equipment room || 1 || - || - || - || 281 281 || 11.3 || - || - || Servers, for loading with ASN-GW and ORBIT Mangement Framework software, for final operating configuration || 0 - 3 || 1,600 || 0 - 4,800 || Depends on final configuration || 282 282 || 11.4 || - || - || Ethernet switch ports for multiple VLANs || - || - || 0 - 2,500 || OpenFlow compatible switch desired; PC-based design underway that utilizes FPGA card, total value: $1300 + $400 = $1700 || … … 300 300 301 301 || Kit || Ordered || Received || Integrated || Delivered || Where || Note || 302 || A1 || 2008 || 2009 || 2009 || 2009 || RutgersWINLAB || p/o ORBIT testbed ||303 || A2 || 2008 || 2009 || 2009 || 2009 || Rutgers WINLAB || software testing||302 || 1.1 || 2008 || 2009 || 2009 || 2009 || Rutgers, WINLAB || p/o ORBIT testbed || 303 || 1.2 || 2008 || 2009 || 2009 || 2009 || Rutgers, Bush Campus || applications || 304 304 305 305 … … 307 307 308 308 || Kit || Ordered || Received || Integrated || Delivered || Where || Note || 309 || B1 || 2009 || plan 5/10 || ? || ? || ? || ? || 310 || B2 || 2009 || plan 5/10 || ? || ? || ? || ? || 311 || B3 || 2009 || plan 5/10 || ? || ? || ? || ? || 312 || B4 || 2009 || plan 5/10 || ? || ? || ? || ? || 313 || B5 || 2009 || plan 5/10 || ? || ? || ? || ? || 314 || B6 || 2009 || plan 5/10 || ? || ? || ? || ? || 315 || B7 || 2009 || plan 5/10 || ? || ? || ? || ? || 316 317 309 || 2.1 || 12/17/09 || plan 5/15/10 || ? || ? || NEC Labs America || ? || 310 || 2.2 || 12/17/09 || plan 5/15/10 || ? || ? || Columbia University || ? || 311 || 2.3 || 12/17/09 || plan 5/15/10 || ? || ? || Polytechnic Institute of NYU || ? || 312 || 2.4 || 12/17/09 || plan 5/15/10 || ? || ? || UCLA || ? || 313 || 2.5 || 12/17/09 || plan 5/15/10 || ? || ? || University of Colorado at Boulder || ? || 314 || 2.6 || 12/17/09 || plan 5/15/10 || ? || ? || UMass Amherst || ? || 315 || 2.7 || 12/17/09 || plan 5/15/10 || ? || ? || University of Wisconsin || ? || 316 317 Issue: It has been planned that three kits will be delivered during Spiral 2, and the remaining four during Spiral 3. It has been planned that the first three kits will be delivered to campuses/sites where there is easy access for support, i.e., at nearby locations: NEC Labs America, Columbia University, and Polytechnic Institute of NYU. However, it would also make sense to deliver a kit ONLY when the campus/site has received an FCC license, and is ready to install the kit. Thus, the delivery sequence may also depend on campus status. 318 318 319 It is expected that a third sets of kit hardware will be ordered in 2010 and will be delivered in ?, For those cmapuses not included in the Spiral 2 projects, or for campuses that want to install additional kits. [[BR]] 319 320 … … 325 326 || C5 || 3/10 || ? || ? || ? || ? || ? || 326 327 327 328 [[BR]] 329 UCLA[[BR]] 330 University of Colorado at Boulder[[BR]] 331 UMass Amherst[[BR]] 332 University of Wisconsin[[BR]] 328 333 === 6.11 Kit Issues === 329 334 … … 332 337 || 6.1 || No. of servers in kit: Are there campuses that can complete their expected experiments operating with only one server? two servers? || Mussman, Seskar, team || - || - || - || - || 333 338 || 6.2 || Federation of WiMAX testbeds: How will federation among WiMAX testbeds be accomplished? || Mussman, Seskar, team || - || - || - || - || 334 || 6.3 || - || -|| - || - || - || - ||339 || 6.3 || Kit delivery sequence: It has been planned that three kits will be delivered during Spiral 2, and the remaining four during Spiral 3. It has been planned that the first three kits will be delivered to campuses/sites where there is easy access for support, i.e., at nearby locations: NEC Labs America, Columbia University, and Polytechnic Institute of NYU. However, it would also make sense to deliver a kit ONLY when the campus/site has received an FCC license, and is ready to install the kit. Thus, the delivery sequence may also depend on campus status. || Mussman, Seskar, team || - || - || - || - || 335 340 || 6.4 || - || - || - || - || - || - || 336 341 || 6.5 || - || - || - || - || - || - ||