    v89 v90  
    188188 * Connect ground cable from grounding bar to the Outdoor Unit.  See Sec 3.4.2.2, Fig 3-9, and Sec 6.3 of the [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)]
    189189 * Connect ground cable from grounding bar to the lightning protector in the weathertight box.
    190  * Connect a coaxial cable between Outdoor Unit and Antenna, including lightning protectors.  See Sec 3.4.2.3, Fig 3-9, 4-1, and Sec 6.4 of the[attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)]
     190 * Connect a coaxial cable between Outdoor Unit and Antenna, including lightning protectors.  See Sec 3.4.2.3, Fig 3-9, 4-1, and Sec 6.4 of the[attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)]  Note:  Use vertical polarization terminal on the antenna, since expect mobile terminals with vertical poalrization.
    191191 * Connect the -48VDC power cable from indoor equipment room to the lightning protector in the weathertight box.
    192192 * Connect the -48VDC power cable from the Outdoor Unit to the lightning protector in the weathertight box.  See Sec 3.4.1, Fig 4-1 and Sec 6.3 of the [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)]
     
    326326
    327327|| Step || Description || Stanford || [http://groups.geni.net/geni/wiki/WIMXRG#CampusInstallationChecklist Rutgers WINLAB] || [http://groups.geni.net/geni/wiki/WIMXRG#CampusInstallationChecklist Rutgers Bush] || [http://groups.geni.net/geni/wiki/WIMXRG#CampusInstallationChecklist NEC] || [http://groups.geni.net/geni/wiki/WIMXCOLUM#CampusInstallationChecklist Columbia] || [http://groups.geni.net/geni/wiki/WIMXNYUPT#CampusInstallationChecklist Poly NYU] || [http://groups.geni.net/geni/wiki/WIMXUCLA#CampusInstallationChecklist UCLA] || [http://groups.geni.net/geni/wiki/WIMXUCO#CampusInstallationChecklist Colorado] || [http://groups.geni.net/geni/wiki/WIMXUMASS#CampusInstallationChecklist UMass] || [http://groups.geni.net/geni/wiki/WIMXUWI#CampusInstallationChecklist Wisc] || [http://groups.geni.net/geni/wiki/WIMXBBN#CampusInstallationChecklist BBN] ||
    328 ||   1  || Identify Outdoor Site on Campus || - || Completed || Completed || - || Completed || Completed || Started || Started || Completed || Completed || Completed 1/28/10 ||
    329 || 2 || Obtain FCC License || - || Completed || Completed || - || Applied 2/25 || Applied 2/22 || Started || Started || Completed 3/2010 || Completed 1st  Started 2nd || Completed 1st 2/24/10  Applied 2nd 1/14/10 ||
     328||   1  || Identify Outdoor Site on Campus || - || Completed || Completed || - || Completed  4/30/10:  Still need site visit by IT || Completed || Started || Completed || Completed || Completed || Completed 1/28/10 ||
     329|| 2 || Obtain FCC License || - || Completed 12/5/08  We2XWE || Completed 12/5/08  We2XWE || - || Completed 4/14/10  WF2XIU  Discussed 2nd 4/30/10 || Completed 1st  4/13/10  WF2XJM   Started 2nd 4/20/10 || Started || Completed 4/19/10  WF2XJV || Completed 3/5/10  WF2XGQ || Completed 1st  Completed 2nd 5/5/10 || Completed 1st 2/24/10  Completed 2nd 3/26/10  WF2XHS ||
    330330|| 3 || Identify Indoor Equipment Room on Campus || - || Completed || - || - || - || Completed || - || - || Completed || - || Completed 7/09 ||
    331331|| 4 || Install Wiring at Outdoor Site and to Indoor Equipment Room || - || Completed || - || - || - || - || - || - || - || - || - ||
    332 || 5 || Install Pole at Outdoor Site and Ground  || - || Completed || - || - || - || - || - || - || - || - ||
    333 || 6 || Install Antenna at Outdoor Site  || - || Completed || - || - || - || - || - || - || - || - || - || 
     332|| 5 || Install Pole at Outdoor Site and Ground  || - || Completed || - || - || - || Completed || - || - || - || - ||
     333|| 6 || Install Antenna at Outdoor Site  || - || Completed 120-degree|| - 120-degree|| - || - 120-degree|| - 120-degree|| - || - || - || - || - 120-degree, 360-degree, 30-degree || 
    334334|| 7 || Install Base Station Outdoor Unit  || - || Completed || - || - || - || - || - || - || - || - || - || 
    335335|| 8 || Complete Wiring at Outdoor Site and to Indoor Equipment Room  || - || Completed || - || - || - || - || - || - || - || - || - || 
     
    338338|| 11 || Install Base Station Indoor Unit  || - || Completed || - || - || - || - || - || - || - || - || - || 
    339339|| 12 || Complete Wiring of Base Station Indoor Unit  || - || Completed || - || - || - || - || - || - || - || - || - || 
    340 || 13 || Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units  || - || Completed || - || - || - || - || - || - || - || - || - || 
     340|| 13 || Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units  || - || Completed || - || - || Plan 6/1/10? || Plan 6/1/10? || - || - || - || - || Plan 6/1/10? || 
    341341|| 14 || Install Ethernet (VLAN) Switch, or Identify Existing Capacity  || - || Completed || - || - || - || - || - || - || - || - || - ||
    342342|| 15 || Install Linux Server(s) and Software || - || Completed || - || - || - || - || - || - || - || - || - || 
    343343|| 16 || Connect Backbone Network  || - || Started || - || - || - || - || - || - || - || - || - || 
    344344|| 17 || Provide Reference Client Platform  || - || Completed || - || - || - || - || - || - || - || - || - || 
    345 || 18 || Initial Check-Out of Campus WiMAX Testbed  || - || Completed || - || - || - || - || - || - || - || - || - ||
     345|| 18 || Initial Check-Out of Campus WiMAX Testbed  || - || Completed || - || - || Plan 6/15/10? || Plan 6/15/10? || - || - || - || - || Plan 6/15/10? ||