322 | | |
| 322 | Columbia University (1770) PI: Henning Schulzrinne [[BR]] |
| 323 | Henning on 2/8: Starting application process with IT. Likely site to be on engineering building, near amateur radio station. [[BR]] |
| 324 | Ivan on 3/1: Application completed. [[BR]] |
| 325 | ISSUE: Verify current status with Henning, antenna 360 or 120 degree? [[BR]] |
| 326 | ISSUE: Harry on 3/30: Concern about Clearwire rollout in NYC; see below. [[BR]] |
| 327 | NOTE: Stanford agreement with Clearwire to utilize 5MHz of their spectrum for on-campus service. [[BR]] |
| 328 | |
| 329 | Polytechnic Institute of NYU (1751) PI: Thanasis Korakis [[BR]] |
| 330 | Thanasis on 2/8: Starting applciation process. Likely site on EE building. [[BR]] |
| 331 | Thanasis on 3/1: Application completed 2/22, for two sites: EE and Admin buildings. Equipment expected in EE building. [[BR]] |
| 332 | Ivan on 3/1: Cables from roof to equipment room include: dual fiber; power; GPS receiver coax; within 1" dimaeter. [[BR]] |
| 333 | Thanasis on 3/16: Equipment in EE building 100m from antenna [[BR]] |
| 334 | Antenna 360 degree [[BR]] |
| 335 | ISSUE: Harry on 3/30: Concern about Clearwire rollout in NYC; see below. [[BR]] |
| 336 | NOTE: Stanford agreement with Clearwire to utilize 5MHz of their spectrum for on-campus service. [[BR]] |
| 337 | |
| 338 | UCLA (1797) PI: Mario Gerla, Giovanni Pau [[BR]] |
| 339 | Giovanni on 3/1: Applying for license. Likely site is top of student housing building, on a hill. [[BR]] |
| 340 | Giovanni on 3/16: Applying for license next week, up to 6 locations. [[BR]] |
| 341 | Expects to need 300m from antenna to equipment.[[BR]] |
| 342 | Antenna, 120 degree [[BR]] |
| 343 | |
| 344 | Wisconsin (1724) PI: Suman Banerjee [[BR]] |
| 345 | Suman on 2/8: Have license, using it with current Cisco base station, owned by Educational Communications Board. Will be applying for a second license. [[BR]] |
| 346 | Have three good sites: one for Cisco, one for this kit, and would like to get a second kit for third site. [[BR]] |
| 347 | Suman on 3/1: Plan to apply for second license this week. [[BR]] |
| 348 | Suman on 3/16: Have agreement to purchase a 2nd kit from NEC. With this, will have three base stations, enough to cover the campus. [[BR]] |
| 349 | Antenna, 120 degree [[BR]] |
| 350 | |
| 351 | UMass Amherst (1731) PI: Mark Corner, Brian Lynn [[BR]] |
| 352 | Brian on 2/8: IT has license that they want to retain. Mark has applied for a second license; pending. [[BR]] |
| 353 | Three possible sites: Top of library building, 20 stories, with equipment room in building. Top of graduate research center building, few stories, with equipment room in building. Top of CS building, few stories, without a good equipment room. [[BR]] |
| 354 | Brian on 3/1: Same as above; no news on license application. [[BR]] |
| 355 | Brian on 3/16: Received license last week! Need to pick site. [[BR]] |
| 356 | Antenna 360 or 120? [[BR]] |
| 357 | Need to virtualize clients, using zen [[BR]] |
| 358 | |
| 359 | Colorado: (1768) PI: Dirk Grunwald, Gary Yee Univ. of Colorado, Boulder [[BR]] |
| 360 | Dirk on 2/8: Have eight sites with 802.11 antennas, ranging from high (6 km range) to low (within clutter of buildings). Another group on campus runs a WiMAX system inside a lab. Starting application process for experimental license. University has leased license to Clearwire, but may some use may still be possible.[[BR]] |
| 361 | Dirk on 3/1: Trying to understand how might use university license. Plan to apply for license this week. Have site and equipment room on Williams Village Building, less than 10m apart. [[BR]] |
| 362 | Gary on 3/16: Getting started on license. [[BR]] |
| 363 | Clearwire expected to begin service in Denver area May, 2010. [[BR]] |
| 364 | Also expect Clearwire to begin service in other areas by the end of 2010; see below. [[BR]] |
| 365 | Antenna 360 or 120 degree? |
| 366 | Dirk and Gary on 3/26: In Denver area, Clearwire using E&F bands. [[BR]] |
| 367 | Expect Univ Colorado to lease 34MHz A1-3,B1-3 blocks to Clearwire near campus, and beyond. [[BR]] |
| 368 | Negotiating with Univ Colorado for 12MHz A4/B4 blocks near campus, but expect them to be leased to Clearwire beyond campus. [[BR]] |
| 369 | Applying for experimental license in C&D bands today [[BR]] |
| 370 | Working with campus IT on getting VLANs to Internet2 [[BR]] |
| 371 | Turnup in early June, 2010 is possible. [[BR]] |
| 372 | Will contact Sprint/Clearwire, to ask about cooperation with GENI, and perhaps info on their 2010 and beyond roadmap [[BR]] |
| 373 | |
| 374 | BBN Technologies, Cambridge MA [[BR]] |
| 375 | Tony Michel is our radio expert; Chaos Golubitsky is responsible for our testbed.[[BR]] |
| 376 | Tony on 2/8: See above and wiki page. Have applied for two licenses; pending. Site survey completed. [[BR]] |
| 377 | Tony on 3/1: Have received first license, 10MHz overlapping Sprint/Clearwire. Applied 1/12, received 2/24. Need to change emission designator. [[BR]] |
| 378 | Tony on 3/16: 360 degree antenna. |
| 379 | Tony on 3/29: Received second license, 5MHz band, not overlapping with Clearwire [[BR]] |
| 380 | |
| 381 | Stanford Univ [[BR]] |
| 382 | Masayoshi Kobayashi on 3/16: Currently, WiMAX site is indoors only, in the Gates building. [[BR]] |
| 383 | Have new agreement with Clearwire to utilize 5MHz of their spectrum for on-campus service. [[BR]] |
| 384 | |
| 385 | NEC America [[BR]] |
| 386 | On 3/16: Currently indoors only. [[BR]] |