Changes between Version 82 and Version 83 of WiMAXInteg/CampusInstallation


Ignore:
Timestamp:
03/31/10 17:55:26 (14 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • WiMAXInteg/CampusInstallation

    v82 v83  
    135135 * Option:  If there is a weathertight enclosure on the roof with 110VAC supply, you may run the -48VDC power cable to the enclosure, and mount the -48VDC power supply there.
    136136 * One dual optical fiber signal cables, from (one) Outdoor Unit to indoor equipment room.  See Sec 3.4.1, Fig 4-1 and Sec 6.4 of the [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)]
     137
     138Ivan Seskar:  [http://groups.geni.net/geni/attachment/wiki/Gec7ClusterEAgenda/2010-03-16%20GEC7%20WiMAX.ppt  slides] [[BR]]
     139Ivan on 3/1:  Cables from roof to equipment room include:  dual fiber;  power;  GPS receiver coax;  within 1" dimaeter.  [[BR]]
    137140
    138141