328 | | === 8.21 Campus Installation and Deployment Plan Summary === |
329 | | |
330 | | |
331 | | === 8.22 Campus Issues === |
| 328 | === 8.21 Campus Deployment Plan === |
| 329 | |
| 330 | The [http://groups.geni.net/geni/attachment/wiki/WiMAXInteg/113009%20v0.5%20GENIDandPInfraBuildouts.pdf GENI D&P WiMAX Infrastructure Buildout] summarizes the entire plan.[[BR]] |
| 331 | |
| 332 | It includes a map of the participating campuses: [[BR]] |
| 333 | [[Image(fig1wimaxcampusbuildout.jpg, 50%)]] [[BR]] |
| 334 | |
| 335 | And a list of involved researchers and IT leaders: [[BR]] |
| 336 | [[Image(tabl1campusresanditlead.jpg, 40%)]] [[BR]] |
| 337 | |
| 338 | The WiMAX Kit Project (1753) outlined the usage plans for each campus: [[BR]] |
| 339 | [[Image(tablesiteplan.jpg, 60%)]] [[BR]] |
| 340 | |
| 341 | |
| 342 | |
| 343 | Current campus deployment status: |
| 344 | |
| 345 | |
| 346 | || Step || Description || BBN || Colu || Poly || UCLA || Colo || UMass || Wisc || |
| 347 | || 1 || Identify Outdoor Site on Campus || - || - || - || - || - || - || - || |
| 348 | || 2 || Obtain FCC License || - || - || - || - || - || - || - || |
| 349 | || 3 || Identify Indoor Equipment Room on Campus || - || - || - || - || - || - || - || |
| 350 | || 4 || Install Wiring at Outdoor Site and to Indoor Equipment Room || - || - || - || - || - || - || - || |
| 351 | || 5 || Install Pole at Outdoor Site and Ground || - || - || - || - || - || - || - || |
| 352 | || 6 || Install Antenna at Outdoor Site || - || - || - || - || - || - || - || |
| 353 | || 7 || Install Base Station Outdoor Unit || - || - || - || - || - || - || - || |
| 354 | || 8 || Complete Wiring at Outdoor Site and to Indoor Equipment Room || - || - || - || - || - || - || - || |
| 355 | || 9 || Install Indoor Equipment Racks and Ground || - || - || - || - || - || - || - || |
| 356 | || 10 || Install 120VAC and -48VDC Power Feeds and/or Supplies || - || - || - || - || - || - || - || |
| 357 | || 11 || Install Base Station Indoor Unit || - || - || - || - || - || - || - || |
| 358 | || 12 || Complete Wiring of Base Station Indoor Unit || - || - || - || - || - || - || - || |
| 359 | || 13 || Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units || - || - || - || - || - || - || - || |
| 360 | || 14 || Install Ethernet (VLAN) Switch, or Identify Existing Capacity || - || - || - || - || - || - || - || |
| 361 | || 15 || Install Linux Server(s) and Software || - || - || - || - || - || - || - || |
| 362 | || 16 || Connect Backbone Network || - || - || - || - || - || - || - || |
| 363 | || 17 || Provide Reference Client Platform || - || - || - || - || - || - || - || |
| 364 | || 18 || Initial Check-Out of Campus WiMAX Testbed || - || - || - || - || - || - || - || |
| 365 | |
| 366 | |
| 367 | === 8.22 Campus Deployment Issues === |
| 368 | |
| 369 | |
| 370 | || No || Issue || Opened || Resolved || Resolution || Note || |
| 371 | || 1 || - || - || - || - || - || |
| 372 | || 2 || - || - || - || - || - || |
| 373 | || 3 || - || - || - || - || - || |
| 374 | || 4 || - || - || - || - || - || |
| 375 | || 5 || - || - || - || - || - || |