    328 === 8.21  Campus Installation and Deployment Plan Summary ===
    329 
    330 
    331 === 8.22  Campus Issues ===
     328=== 8.21  Campus Deployment Plan ===
     329
     330The [http://groups.geni.net/geni/attachment/wiki/WiMAXInteg/113009%20v0.5%20GENIDandPInfraBuildouts.pdf  GENI D&P WiMAX Infrastructure Buildout] summarizes the entire plan.[[BR]]
     331
     332It includes a map of the participating campuses:  [[BR]]
     333[[Image(fig1wimaxcampusbuildout.jpg, 50%)]]  [[BR]]
     334
     335And a list of involved researchers and IT leaders:  [[BR]]
     336[[Image(tabl1campusresanditlead.jpg, 40%)]]  [[BR]]
     337
     338The WiMAX Kit Project (1753) outlined the usage plans for each campus: [[BR]]
     339[[Image(tablesiteplan.jpg, 60%)]]  [[BR]]
     340
     341
     342
     343Current campus deployment status:
     344
     345
     346|| Step || Description || BBN || Colu || Poly || UCLA || Colo || UMass || Wisc ||
     347||   1  || Identify Outdoor Site on Campus || - || - || - || - || - || - || - ||
     348|| 2 || Obtain FCC License || - || - || - || - || - || - || - ||
     349|| 3 || Identify Indoor Equipment Room on Campus || - || - || - || - || - || - || - ||
     350|| 4 || Install Wiring at Outdoor Site and to Indoor Equipment Room || - || - || - || - || - || - || - ||
     351|| 5 || Install Pole at Outdoor Site and Ground  || - || - || - || - || - || - || - ||
     352|| 6 || Install Antenna at Outdoor Site  || - || - || - || - || - || - || - ||
     353|| 7 || Install Base Station Outdoor Unit  || - || - || - || - || - || - || - ||
     354|| 8 || Complete Wiring at Outdoor Site and to Indoor Equipment Room  || - || - || - || - || - || - || - ||
     355|| 9 || Install Indoor Equipment Racks and Ground  || - || - || - || - || - || - || - ||
     356|| 10 || Install 120VAC and -48VDC Power Feeds and/or Supplies  || - || - || - || - || - || - || - ||
     357|| 11 || Install Base Station Indoor Unit  || - || - || - || - || - || - || - ||
     358|| 12 || Complete Wiring of Base Station Indoor Unit  || - || - || - || - || - || - || - ||
     359|| 13 || Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units  || - || - || - || - || - || - || - ||
     360|| 14 || Install Ethernet (VLAN) Switch, or Identify Existing Capacity  || - || - || - || - || - || - || - ||
     361|| 15 || Install Linux Server(s) and Software || - || - || - || - || - || - || - ||
     362|| 16 || Connect Backbone Network  || - || - || - || - || - || - || - ||
     363|| 17 || Provide Reference Client Platform  || - || - || - || - || - || - || - ||
     364|| 18 || Initial Check-Out of Campus WiMAX Testbed  || - || - || - || - || - || - || - ||
     365
     366
     367=== 8.22  Campus Deployment Issues ===
     368
     369
     370|| No ||  Issue  ||  Opened  ||  Resolved  || Resolution  ||  Note  ||
     371|| 1  ||   -  ||  -  ||  -  || -  || -  ||
     372|| 2  ||   -  ||  -  ||  -  || -  || -  || 
     373|| 3  ||   -  ||  -  ||  -  || -  || -  || 
     374|| 4  ||   -  ||  -  ||  -  || -  || -  || 
     375|| 5  ||   -  ||  -  ||  -  || -  || -  ||