Changes between Version 37 and Version 38 of WiMAXInteg/CampusInstallation
- Timestamp:
- 02/08/10 10:03:36 (14 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
WiMAXInteg/CampusInstallation
v37 v38 2 2 3 3 4 == 7. Campus Installation ==4 == 8. Campus Installation == 5 5 6 6 The following sections outline the steps necessary to complete a campus installation, based on a WiMAX base station kit provided by Rutgers WINLAB and NEC. … … 37 37 38 38 39 See Section 7.20 for complete, detailed list.39 See Section 8.20 for complete, detailed list. 40 40 41 41 42 42 Once the WiMAX base station kit has been installed on the campus, and is operational, the GPO can arrange the transfer of ownership from the NSF to the university. 43 43 44 === 7.1 Identify Outdoor Site on Campus ===44 === 8.1 Identify Outdoor Site on Campus === 45 45 46 46 An outdoor site (e.g., the roof of a building) should be identified on campus that meets these requirements: … … 57 57 ISSUE: Do we also need GPS receiver and antenna, per NEC documentation? If we do not install it now, what might we be missing later? 58 58 59 === 7.2 Obtain FCC License ===59 === 8.2 Obtain FCC License === 60 60 61 61 Each campus must apply to the FCC and obtain a license (experimental authorization) to operate the WiMAX equipment at their location. '''NOTE: It is suggested that this process be started IMMEDIATELY following the selection of outdoor location, to assure that a license can be obtained.''' … … 102 102 ISSUE: What happens when Sprint/ClearWire stsrts commercial service in the area? Must shut down? When might this be expected? 103 103 104 === 7.3 Identify Indoor Equipment Room on Campus ===104 === 8.3 Identify Indoor Equipment Room on Campus === 105 105 106 106 An indoor site (e.g., an IT equipment room) should be identified on campus that meets the requirements listed in Section 1.3 of the [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)], and particularly the following requirments: … … 129 129 130 130 131 === 7.4 Install Wiring at Outdoor Site and to Indoor Equipment Room ===131 === 8.4 Install Wiring at Outdoor Site and to Indoor Equipment Room === 132 132 133 133 The following cables must be run at the Outdoor Site and between the Outdoor Site and the Indoor Equipment Room: … … 147 147 148 148 149 === 7.5 Install Pole at Outdoor Site and Ground ===149 === 8.5 Install Pole at Outdoor Site and Ground === 150 150 151 151 A pole must be provided and mounted at the outdoor site to safely and securely mount the Antenna and Base Station Outdoor Unit. … … 168 168 169 169 170 === 7.6 Install Antenna at Outdoor Site ===170 === 8.6 Install Antenna at Outdoor Site === 171 171 172 172 [[Image(Antenna.jpg, height=160px, align=right)]] … … 182 182 183 183 184 === 7.7 Install Base Station Outdoor Unit ===184 === 8.7 Install Base Station Outdoor Unit === 185 185 186 186 The Base Station Outdoor Unit (ODU) is mounted outdoors, near the antenna. … … 191 191 192 192 193 === 7.8 Complete Wiring at Outdoor Site and to Indoor Equipment Room ===193 === 8.8 Complete Wiring at Outdoor Site and to Indoor Equipment Room === 194 194 195 195 * Verify connection of heavy ground cable, from building ground to grounding bar at Outdoor Site, and from grounding bar to pole, for lightning protection. Connect ground cable from grounding bar to the Outdoor Unit. See Sec 3.4.2.2, Fig 3-9, and Sec 6.3 of the [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)] … … 204 204 205 205 206 === 7.9 Install Indoor Equipment Racks and Ground ===206 === 8.9 Install Indoor Equipment Racks and Ground === 207 207 208 208 Install (or identify) indoor equipment racks in the indoor equipment room, per Sec 2.3.3 of the [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)], with sufficient space to mount: … … 219 219 220 220 221 === 7.10 Install 120VAC and -48VDC Power Feeds and/or Supplies ===221 === 8.10 Install 120VAC and -48VDC Power Feeds and/or Supplies === 222 222 223 223 … … 232 232 233 233 234 === 7.11 Install Base Station Indoor Unit ===234 === 8.11 Install Base Station Indoor Unit === 235 235 236 236 Install the Base Station Indoor Unit (IDU) on the indoor equipment racks, per Sec 2.3 of the [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)] … … 254 254 255 255 256 === 7.12 Complete Wiring of Base Station Indoor Unit ===256 === 8.12 Complete Wiring of Base Station Indoor Unit === 257 257 258 258 Complete external connections to the Base Station Indoor Unit as explained in Sec 2.4.1 of [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)] … … 269 269 270 270 271 === 7.13 Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units ===271 === 8.13 Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units === 272 272 273 273 Turn power ON to the Base Station Indoor and Outdoor Units, per Sec 5 of [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)] … … 277 277 ISSUE: What could be done without an ASN-GW? What could be done with a rudimentary ASN-GW? 278 278 279 === 7.14 Install Ethernet (VLAN) Switch, or Identify Existing Capacity ===280 281 282 === 7.15 Install Linux Server(s) and Software ===283 284 285 === 7.16 Connect Backbone Network ===286 287 288 === 7.17 Provide Reference Client Platform ===289 290 291 === 7.18 Inital Check-Out of Campus WiMAX Testbed ===292 293 === 7.19 Campus Installation Checklist ===279 === 8.14 Install Ethernet (VLAN) Switch, or Identify Existing Capacity === 280 281 282 === 8.15 Install Linux Server(s) and Software === 283 284 285 === 8.16 Connect Backbone Network === 286 287 288 === 8.17 Provide Reference Client Platform === 289 290 291 === 8.18 Inital Check-Out of Campus WiMAX Testbed === 292 293 === 8.19 Campus Installation Checklist === 294 294 295 295 Campus Installation Checklist, for each site [[BR]] … … 319 319 320 320 321 === 7.20 Campus Bill of Materials ===322 323 324 === 7.21 Campus Installation and Deployment Plan Summary ===321 === 8.20 Campus Bill of Materials === 322 323 324 === 8.21 Campus Installation and Deployment Plan Summary ===