    4 == 7.  Campus Installation ==
     4== 8.  Campus Installation ==
    55
    66The following sections outline the steps necessary to complete a campus installation, based on a WiMAX base station kit provided by Rutgers WINLAB and NEC. 
     
    3737
    3838
    39 See Section 7.20 for complete, detailed list.
     39See Section 8.20 for complete, detailed list.
    4040 
    4141
    4242Once the WiMAX base station kit has been installed on the campus, and is operational, the GPO can arrange the transfer of ownership from the NSF to the university.
    4343
    44 === 7.1  Identify Outdoor Site on Campus ===
     44=== 8.1  Identify Outdoor Site on Campus ===
    4545
    4646An outdoor site (e.g., the roof of a building) should be identified on campus that meets these requirements:
     
    5757ISSUE:  Do we also need GPS receiver and antenna, per NEC documentation?  If we do not install it now, what might we be missing later?
    5858
    59 === 7.2  Obtain FCC License ===
     59=== 8.2  Obtain FCC License ===
    6060
    6161Each campus must apply to the FCC and obtain a license (experimental authorization) to operate the WiMAX equipment at their location. '''NOTE: It is suggested that this process be started IMMEDIATELY following the selection of outdoor location, to assure that a license can be obtained.'''
     
    102102ISSUE:  What happens when Sprint/ClearWire stsrts commercial service in the area?  Must shut down?  When might this be expected?
    103103
    104 === 7.3  Identify Indoor Equipment Room on Campus ===
     104=== 8.3  Identify Indoor Equipment Room on Campus ===
    105105
    106106An indoor site (e.g., an IT equipment room) should be identified on campus that meets the requirements listed in Section 1.3 of the [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)], and particularly the following requirments:
     
    129129
    130130
    131 === 7.4  Install Wiring at Outdoor Site and to Indoor Equipment Room ===
     131=== 8.4  Install Wiring at Outdoor Site and to Indoor Equipment Room ===
    132132
    133133The following cables must be run at the Outdoor Site and between the Outdoor Site and the Indoor Equipment Room:
     
    147147
    148148
    149 === 7.5  Install Pole at Outdoor Site and Ground ===
     149=== 8.5  Install Pole at Outdoor Site and Ground ===
    150150
    151151A pole must be provided and mounted at the outdoor site to safely and securely mount the Antenna and Base Station Outdoor Unit.
     
    168168
    169169
    170 === 7.6  Install Antenna at Outdoor Site ===
     170=== 8.6  Install Antenna at Outdoor Site ===
    171171
    172172[[Image(Antenna.jpg, height=160px, align=right)]]
     
    182182
    183183
    184 === 7.7  Install Base Station Outdoor Unit ===
     184=== 8.7  Install Base Station Outdoor Unit ===
    185185
    186186The Base Station Outdoor Unit (ODU) is mounted outdoors, near the antenna. 
     
    191191
    192192
    193 === 7.8 Complete Wiring at Outdoor Site and to Indoor Equipment Room ===
     193=== 8.8 Complete Wiring at Outdoor Site and to Indoor Equipment Room ===
    194194
    195195 * Verify connection of heavy ground cable, from building ground to grounding bar at Outdoor Site, and from grounding bar to pole, for lightning protection. Connect ground cable from grounding bar to the Outdoor Unit.  See Sec 3.4.2.2, Fig 3-9, and Sec 6.3 of the [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)]
     
    204204
    205205
    206 === 7.9  Install Indoor Equipment Racks and Ground ===
     206=== 8.9  Install Indoor Equipment Racks and Ground ===
    207207
    208208Install (or identify) indoor equipment racks in the indoor equipment room, per Sec 2.3.3 of the [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)], with sufficient space to mount:
     
    219219
    220220
    221 === 7.10 Install 120VAC and -48VDC Power Feeds and/or Supplies ===
     221=== 8.10 Install 120VAC and -48VDC Power Feeds and/or Supplies ===
    222222
    223223
     
    232232
    233233
    234 === 7.11 Install Base Station Indoor Unit ===
     234=== 8.11 Install Base Station Indoor Unit ===
    235235
    236236Install the Base Station Indoor Unit (IDU) on the indoor equipment racks, per Sec 2.3 of the [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)] 
     
    254254
    255255
    256 === 7.12  Complete Wiring of Base Station Indoor Unit ===
     256=== 8.12  Complete Wiring of Base Station Indoor Unit ===
    257257
    258258Complete external connections to the Base Station Indoor Unit as explained in Sec 2.4.1 of [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)]
     
    269269
    270270
    271 === 7.13  Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units ===
     271=== 8.13  Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units ===
    272272
    273273Turn power ON to the Base Station Indoor and Outdoor Units, per Sec 5 of [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)]
     
    277277ISSUE:  What could be done without an ASN-GW?  What could be done with a rudimentary ASN-GW?
    278278
    279 === 7.14 Install Ethernet (VLAN) Switch, or Identify Existing Capacity ===
    280 
    281 
    282 === 7.15  Install Linux Server(s) and Software ===
    283 
    284 
    285 === 7.16  Connect Backbone Network ===
    286 
    287 
    288 === 7.17  Provide Reference Client Platform ===
    289 
    290 
    291 === 7.18 Inital Check-Out of Campus WiMAX Testbed ===
    292 
    293 ===  7.19  Campus Installation Checklist ===
     279=== 8.14 Install Ethernet (VLAN) Switch, or Identify Existing Capacity ===
     280
     281
     282=== 8.15  Install Linux Server(s) and Software ===
     283
     284
     285=== 8.16  Connect Backbone Network ===
     286
     287
     288=== 8.17  Provide Reference Client Platform ===
     289
     290
     291=== 8.18 Inital Check-Out of Campus WiMAX Testbed ===
     292
     293===  8.19  Campus Installation Checklist ===
    294294
    295295Campus Installation Checklist, for each site [[BR]]
     
    319319
    320320
    321 ===  7.20  Campus Bill of Materials ===
    322 
    323 
    324 ===  7.21  Campus Installation and Deployment Plan Summary ===
     321===  8.20  Campus Bill of Materials ===
     322
     323
     324===  8.21  Campus Installation and Deployment Plan Summary ===