Changes between Version 31 and Version 32 of WiMAXInteg/CampusInstallation


Ignore:
Timestamp:
12/28/09 16:09:24 (14 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • WiMAXInteg/CampusInstallation

    v31 v32  
    7474Once application process is completed and assuming there are no issues with the particular location, FCC will issue a WIMAX license after 4-8 weeks .
    7575
    76 Here is a sample license, the [attachment:Winlab-WiMax-License.pdf WINLAB Rutgers WiMAX license] received from the FCC.
     76Here is a sample license, the [attachment:Winlab-WiMax-License.pdf WINLAB Rutgers WiMAX license] received from the FCC.  Items of note include:
     77 * Two sites were requested and received, which might permit handover experiments.
     78 * Both requested a 10MHz band around center frequesncies of 2590 (2586-2595) MHz and 2610 (2605-2615) MHz
     79 * Both requested the maximum allowable Effective Radiated Power of 32 W, even though the NEC equipment is limited to 20 W.
    7780
    7881ISSUE:  The Rutgers/WINLAB license state:  "Licensee must get consent from Educational Broadband Services and Broadband