    174174ISSUE:  Does kit contain these cables?
    175175
    176  * One -48VDC power cable, from Outdoor Unit to indoor equipment room.  See ?
    177 
    178  * Two fiber signal cables, from Outdoor Unit to indoor equipment room.  See ?
    179 
    180176 * Connect one -48VDC power cable from indoor equipment room to Outdoor Unit.  See Figures 3-9, 4-1 and Sections 3.4.1 and 6.3 of the [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)]
    181177
     
    187183Install (or identify) indoor equipment racks in the indoor equipment room, with sufficient space to mount:
    188184
    189  * Base Station Indoor Unit (5U).  See ?
     185 * Base Station Indoor Unit (5U). 
    190186
    191187 * Three Linux Servers (3 x 1U = 3U)
     
    217213
    218214The IDU in the kit is equipped for 1-Sector Configuration, per Figure 2-3 of [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)], and includes:
     215
    219216 * One NW INTFC unit.
    220217
     
    230227ISSUE:  Optionally, each CHC unit could support two Outdoor Units and Sector Antennas.  Is there any reason to do this?  Or, is this for redundancy?
    231228
    232 ISSUE:  Optionally, two additional CHC units could be installed.  WIll there ever be areason to do this?  To serve multiple sectors?
     229ISSUE:  Optionally, two additional CHC units could be installed.  Will there ever be areason to do this?  To serve multiple sectors?
    233230
    234231
    235232=== 7.12  Complete Wiring of Base Station Indoor Unit ===
    236233
     234 * Connect ground cable from Indoor Unit to building ground.  See Sections 2.4.1 and 2.4.3.3 and Figure 2-4 of [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)]
     235
     236 * Connect power cable from NW INTFC unit within the Indoor Unit to -48VDC feed, or -48VDC rectifier.  See Sections 2.4.1 and 2.4.3.1 and Figure 2-4 of [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)]
     237
     238ISSUE:  Doee the kit provide this cable?
     239
     240 * Connect ethernet cable from NW INTFC unit within the Indoor Unit to VLAN switch, for access to ASN-GW functions.  See Sections 2.4.1 and 2.4.3.2 and Figure 2-4 of [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)]
     241
     242
     243 * Connect two optical fibers from Outdoor Unit to CHC unit within the Indoor Unit.  See Section 2.4.2 and Figure 2-5 of [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)]
     244
    237245
    238246=== 7.13  Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units ===
    239247
     248Turn power ON to the Base Station Indoor and Outdoor Units, per Section 5 of [attachment:BS_INSTALLATION.pdf NEC Installation Manual for Base Station (IMN:BS)]
     249
     250COmplete initial checkout of the of the antenna and Base Station Outdoor and Indoor Units.
     251
     252ISSUE:  What could be done without an ASN-GW?  What could be done with a rudimentary ASN-GW?
    240253
    241254=== 7.14 Install Ethernet (VLAN) Switch, or Identify Existing Capacity ===