Changes between Version 1 and Version 2 of WiMAXHandoverService


Ignore:
Timestamp:
11/02/12 16:55:55 (11 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • WiMAXHandoverService

    v1 v2  
    66
    77 [http://groups.geni.net/geni/attachment/wiki/WiMAXArchitectureOverview/032312_WiMAXExtensionOverview.pptx  slide]  [[BR]]
     8
     9=== 4.2)  New services:  Multiple Base-Station Mgmt Srvc and  Data-Path GW Srvc ===
     104:10pm  [[br]]
     11Ivan Seskar  (Rutgers WINLAB) and Davide Pesavento (UCLA)  [[BR]]
     12
     13 * Multiple Base-Station Mgmt Srvc:  [[BR]]
     14
     15 * 1)  Have updated WiMAX RF AggMgr for NEC base station to 2.5.3+;  additional updates coming  [[BR]]
     16  * Feeds management data to centralized DB at WINLAB, for GENI-wide monitoring  [[BR]]
     17  * Due:  ?  [[BR]]
     18
     19 *  2)  New WiMAX RF AggMgr for Airspan base station  [[BR]]
     20  * Provides configuration, to replace Netspan;  now running  [[BR]]
     21  * Provides node authorization, and measurements per client  [[BR]]
     22  * First version due:  12/15/12 [[BR]]
     23  * Could BBN, NYU Poly begin testing early version, to replace Netspan?    [[BR]]
     24  * Could early version be shipped to sites on yellow node, with OMF/OML?   [[BR]]
     25
     26 *  3)  Build WiMAX RF AggMgr that can control multiple BSs, either NEC and/or Airspan, with same API  [[BR]]
     27  * Should be useful for handover/multi-homing functions:  shared white list of MS, allowed to connect to one BS or another  [[BR]]
     28  * What other features are needed?  [[BR]]
     29  * First version due:  3/15/13  [[BR]]
     30
     31 * Data-path GW Srvc:  [[BR]]
     32  * Bridges each base station to global datapath  [[BR]]
     33  * Includes CLICK router (two types) [[BR]]
     34  * Includes OpenV switch  (open-source OF) [[BR]]
     35  * Should be useful for handover/multi-homing functions [[BR]]
     36  * First version due:  3/15/13  [[BR]]
     37  * Could there be an earlier version, that provides basic functions, and be manually configured? 
     38  * Could BBN, NYU Poly begin testing early version?    [[BR]]
     39  * Could early version be shipped to sites on yellow node?   [[BR]]
     40 
     41What are next steps?   [[BR]]
     42 * Finalize features for WiMAX RF AggMgr releases  (due 11/15/12) [[BR]]
     43 * Establish delivery schedule for WiMAX RF AggMgr releases [[BR]]
     44 * Could there be an earlier version fo WiMAX RF AggMgr, that provides just basic functions, and be manually configured?  released by 11/15/12?  [[BR]]
     45 * Establish acceptance test plan by BBN, NYU Poly, for WiMAX RF AggMgr releases [[BR]]
     46 * Finalize features for Data-path GW Srvc releases (due 11/15/12)  [[BR]]
     47 * Establish delivery schedule for Data-path GW Srvc releases [[BR]]
     48 * Establish acceptance test plan by BBN, NYU Poly, for WiMAX RF AggMgr releases [[BR]]