Changes between Version 37 and Version 38 of WiMAX


Ignore:
Timestamp:
10/21/09 09:59:14 (14 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • WiMAX

    v37 v38  
    4545 2) Import a control framework from the Orbit project, and implement GENI-specific software on an external Linux-based PC controller for the WiMAX base station, demonstrating basic GENI compliance:  virtualization, slice setup & resource management, L2/L3 programmability, and opt-in for off-the shelf terminals.  [http://www.winlab.rutgers.edu/docs/focus/GENI.html  GENI Projects at WINLAB][[BR]]
    4646 3) Integrate the GBSN with backhaul options to validate and demonstrate the total access networking solution, including VLAN connections to a GENI backbone network.  [http://www.winlab.rutgers.edu/docs/focus/GENI.html  GENI Projects at WINLAB][[BR]]
    47  4) Demonstrate the GBSN capabilities in a phased manner, starting with controlled lab tests of each GENI feature and then migrating to a small-scale outdoor trial with off-the-shelf WiMAX
    48 terminal equipment.  [http://www.winlab.rutgers.edu/docs/focus/GENI.html  GENI Projects at WINLAB][[BR]]
    49  5) Develop a deployment plan for multi-cell WiMAX services in GENI, including guidelines for site selection, frequency allocation, network backhaul and equipment/operating costs.[http://www.winlab.rutgers.edu/docs/focus/GENI.html  GENI Projects at WINLAB][[BR]]
     47 4) Demonstrate the GBSN capabilities in a phased manner, starting with controlled lab tests of each GENI feature and then migrating to a small-scale outdoor trial with off-the-shelf WiMAX terminal equipment.  [http://www.winlab.rutgers.edu/docs/focus/GENI.html  GENI Projects at WINLAB][[BR]]
     48 5) Develop a deployment plan for multi-cell WiMAX services in GENI, including guidelines for site selection, frequency allocation, network backhaul and equipment/operating costs.  [http://www.winlab.rutgers.edu/docs/focus/GENI.html  GENI Projects at WINLAB][[BR]]
    5049 
    5150