Version 3 (modified by 12 years ago) (diff) | ,
---|
Project Number
1890
Project Title
WiMAX Prototyping in Metro Detroit: Integrating GENI Engineering with Wireless Network Applications and Science
a.k.a. WIMXWAYNE
Technical Contacts
PI: Hongwei Zhang, Wayne State University, hongwei@wayne.edu
Co-PI: TJ Giuli, Ford Motor Company
Co-PI: Jayanthi Rao, Ford Motor Company
Co-PI: Jing Zhu, Intel Corporation
Co-PI: Xiangying Yang, Intel Corporation
Co-PI: Patrick Gossman, Community Telecommunications Network, Wayne State University
Participating Organizations
Wayne State University
Ford Motor Company
Intel Corporation
Community Telecommunications Network
GPO Liaison System Engineer
GPO System Engineer: Harry Mussman
Scope
This project will deploy a multi-sector WiMAX network (three sectors total) in Metro Detroit which supports handoff, based on WiMAX base station kits provided by Rutgers. The sectors will be connected via a flexible access network to the GENI backbone network (e.g., NLR). It will develop and deploy a WiMAX mobile station platform with measurement services, based upon baseline mobile station software provided by Rutgers, and including OpenXC provided by Ford. It will utilize the WiMAX network and mobile stations for experiments in sensing and vehicular infotainment.
Current Capabilities
BRIEF descriptions of resources/functions/tools that are available to anyone in the GENI community
Milestones
Spiral 4
- MilestoneDate(WIMXWAYNE: S4.a Demonstration at GEC12 and Experimenter Outreach)?
- MilestoneDate(WIMXWAYNE: S4.b Documentation and Code Release)?
- MilestoneDate(WIMXWAYNE: S4.c Demonstration at GEC13 and Experimenter Outreach)?
- MilestoneDate(WIMXWAYNE: S4.d Documentation and Code Release)?
- MilestoneDate(WIMXWAYNE: S4.e Demonstration at GEC14 and Experimenter Outreach)?
- MilestoneDate(WIMXWAYNE: S4.f Final report and code release)?
Project Technical Documents
Links to wiki pages for the project's technical documents go here. List should include any document in the working groups, as well as other useful documents. Projects may have a full tree of wiki pages here.
Quarterly Status Reports
due 31Dec09: 4Q09 Status Report
Spiral 2 Connectivity
Links to wiki pages about details of infrastrcture that the project is using (if any). Examples include IP addresses, hostnames, URLs, DNS servers, local site network maps, VLANIDs (if permanent VLANs are used), pointers to public keys. GPO may do first drafts of any of these and have the PI correct them to bootstrap. May also include ticket links for pending or known connectivity issues. Many projects will have a full tree of wiki pages here.
Related Projects
Project-Name Includes non-GENI projects.
Attachments (5)
-
WayneWiMAX-deployment-plan-GEC12.pdf (3.1 MB) - added by 12 years ago.
Initial WiMAX deployment plan at Wayne State University (GEC12)
-
WayneWiMAX-deployment-plan-GEC13.pdf (1.6 MB) - added by 12 years ago.
Refined/final WiMAX deployment plan at Wayne State University (GEC13)
-
Status report - GEC13.pdf (91.1 KB) - added by 12 years ago.
Status report - GEC13
-
WayneWiMAX-deployment-planAndStatus-GEC14.pdf (986.6 KB) - added by 12 years ago.
Status report at GEC14
-
Status report - GEC14.pdf (109.4 KB) - added by 12 years ago.
Project Report as of GEC14