Version 33 (modified by 12 years ago) (diff) | ,
---|
Project Number
1724
Project Title
A Programmable Facility for Experimentation with Wireless Heterogeneity and Wide-area Mobility
a.k.a WIMXUWI
Technical Contacts
PI: Suman Banerjee suman@cs.wisc.edu
co-PI: Sateesh Addepalli sateeshk@cisco.com
Participating Organizations
Wisconsin Wireless and NetworkinG Systems (WiNGS) laboratory
Cisco Systems
Related Projects
Open GENI WiMAX Base Station Kit for Campus Deployments
GPO Liaison System Engineer
Harry Mussman hmussman@geni.net
Scope
This project will integrate the currently operational, heterogeneous WiNGS-outdoor testbed spanning 60 square miles in and around Madison, WI, called MadBed, into GENI, and provide systematic low-level access to PHY/MAC features using the ORBIT Management Framework (OMF). It will add a “GENI WiMax Base Station Kit”, provided by an associated proposal, to the testbed to complement an existing Cisco/Navini WiMax base station. It will add a mobility services engine to the testbed, and enhance the user nodes, to allow the testbed to support a wide range of wireless experiments. It will provide a unique trial mechanism for opt-in users in the broader Madison area.
Current Capabilities
Visit http://cs.wisc.edu/wings/projects/geni/ for more information
Milestones
Spiral 4
- MilestoneDate(WIMXUWI: S4.a Demonstration at GEC12 and Experimenter Outreach)?
- MilestoneDate(WIMXUWI: S4.b Documentation and Code Release)?
- MilestoneDate(WIMXUWI: S4.c Demonstration at GEC13 and Experimenter Outreach)?
- MilestoneDate(WIMXUWI: S4.d Documentation and Code Release)?
- MilestoneDate(WIMXUWI: S4.e Demonstration at GEC14 and Experimenter Outreach)?
- MilestoneDate(WIMXUWI: S4.f Final report and code release)?
Campus Installation Checklist
University of Wisconsin
Contact(s):
PI: Suman Banerjee suman@cs.wisc.edu
Cisco Base Station | |||
Step | Description | Status | Comment |
1 | Identify Outdoor Site on Campus | Completed | On top of the Computer Science building. |
2 | Obtain FCC License | Completed | Have license owned by Educational Communications Board, using it with Cisco base station. |
3 | Identify Indoor Equipment Room on Campus | Completed | - |
4 | Install Wiring at Outdoor Site and to Indoor Equipment Room | Completed | - |
5 | Install Pole at Outdoor Site and Ground | Completed | - |
6 | Install Antenna at Outdoor Site | Completed | - |
7 | Install Base Station Outdoor Unit | Completed | - |
8 | Complete Wiring at Outdoor Site and to Indoor Equipment Room | Completed | - |
9 | Install Indoor Equipment Racks and Ground | Completed | - |
10 | Install 120VAC and -48VDC Power Feeds and/or Supplies | Completed | - |
11 | Install Base Station Indoor Unit | Completed | - |
12 | Complete Wiring of Base Station Indoor Unit | Completed | - |
13 | Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units | - | - |
14 | Install Ethernet (VLAN) Switch, or Identify Existing Capacity | - | - |
15 | Install Linux Server(s) and Software | - | - |
16 | Connect Backbone Network | - | - |
17 | Provide Reference Client Platform | - | - |
18 | Initial Check-Out of Campus WiMAX Testbed | - | - |
NEC Base Station 1 | |||
Step | Description | Status | Comment |
1 | Identify Outdoor Site on Campus | Completed | On top of the Waisman Center. |
2 | Obtain FCC License | Completed | - |
3 | Identify Indoor Equipment Room on Campus | Completed | - |
4 | Install Wiring at Outdoor Site and to Indoor Equipment Room | Completed | - |
5 | Install Pole at Outdoor Site and Ground | Completed | - |
6 | Install Antenna at Outdoor Site | Completed | - |
7 | Install Base Station Outdoor Unit | Completed | - |
8 | Complete Wiring at Outdoor Site and to Indoor Equipment Room | Completed | - |
9 | Install Indoor Equipment Racks and Ground | Completed | - |
10 | Install 120VAC and -48VDC Power Feeds and/or Supplies | Completed | - |
11 | Install Base Station Indoor Unit | Completed | - |
12 | Complete Wiring of Base Station Indoor Unit | Completed | - |
13 | Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units | Completed | - |
14 | Install Ethernet (VLAN) Switch, or Identify Existing Capacity | Completed | - |
15 | Install Linux Server(s) and Software | Completed | - |
16 | Connect Backbone Network | - | - |
17 | Provide Reference Client Platform | - | - |
18 | Initial Check-Out of Campus WiMAX Testbed | - | - |
NEC Base Station 2 | |||
Step | Description | Status | Comment |
1 | Identify Outdoor Site on Campus | Planned | Currently planned on the Helen C. White building. Still waiting for approvals. |
2 | Obtain FCC License | - | May be completed. Will verify soon. |
3 | Identify Indoor Equipment Room on Campus | - | - |
4 | Install Wiring at Outdoor Site and to Indoor Equipment Room | - | - |
5 | Install Pole at Outdoor Site and Ground | - | - |
6 | Install Antenna at Outdoor Site | - | - |
7 | Install Base Station Outdoor Unit | - | - |
8 | Complete Wiring at Outdoor Site and to Indoor Equipment Room | - | - |
9 | Install Indoor Equipment Racks and Ground | - | - |
10 | Install 120VAC and -48VDC Power Feeds and/or Supplies | - | - |
11 | Install Base Station Indoor Unit | - | - |
12 | Complete Wiring of Base Station Indoor Unit | - | - |
13 | Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units | - | - |
14 | Install Ethernet (VLAN) Switch, or Identify Existing Capacity | - | - |
15 | Install Linux Server(s) and Software | - | - |
16 | Connect Backbone Network | - | - |
17 | Provide Reference Client Platform | - | - |
18 | Initial Check-Out of Campus WiMAX Testbed | - | - |
Status Reports and Demos
2011 Q1 Status Report
2012 Q1 Status Report
2012 Q1 Status Report
Technical Documents
Software Releases
Data script written for getting WiMAX measurements
Connectivity
============================== ========= ====== ====== ====================== ========= ======= **WiMAX Devices** ----------------------------------------------------------------------------------------------------- Device Name Interface NEC Cisco NEC Average Throughput Cisco Comment ============================== ========= ====== ====== ====================== ========= ======= AWB US210 USB X X 3-5 Mbps ~3 Mbps Have not tried the US211 Intel 6250 Advanced N + WiMAX mini PCIe X IP 6-16 Mbps IP xx Teltonika UM62x1 USB X X IP IP Throughput seems about as good as the 6250. ============================== ========= ====== ====== ====================== ========= =======
More information on configuring and setting up the Teltonika device.
Coverage
Using the Teltonika device mentioned above, these measurements were recorded using the python script also found on this page. The Teltonika device is able to connect to both base stations.
Experiment Setup:
- Dell mini 10 - Ubuntu 11.10
- Teltonika UM62x1
- Generic USB GPS device
- Madison Metro route 80
Attachments (4)
- 9-1-2010--UW-Madison-WIMXUWI.pptx (412.0 KB) - added by 14 years ago.
- wisc wimax GEC_10_Demo_Poster.pdf (1.2 MB) - added by 13 years ago.
-
Cisco_WiMAX_1.jpg (171.1 KB) - added by 13 years ago.
RSSI Data - Cisco - Route 80
-
NEC_WiMAX_1.jpg (971.5 KB) - added by 13 years ago.
NEC - RSSI - Route 80