wiki:WIMXUWI

Version 21 (modified by dmeyer@cs.wisc.edu, 14 years ago) (diff)

--

Project Number

1724

Project Title

A Programmable Facility for Experimentation with Wireless Heterogeneity and Wide-area Mobility
a.k.a WIMXUWI

Technical Contacts

PI: Suman Banerjee suman@cs.wisc.edu
co-PI: Sateesh Addepalli sateeshk@cisco.com

Participating Organizations

Wisconsin Wireless and NetworkinG Systems (WiNGS) laboratory
Cisco Systems

GPO Liaison System Engineer

Harry Mussman hmussman@geni.net

Scope

This project will integrate the currently operational, heterogeneous WiNGS-outdoor testbed spanning 60 square miles in and around Madison, WI, called MadBed, into GENI, and provide systematic low-level access to PHY/MAC features using the ORBIT Management Framework (OMF). It will add a “GENI WiMax Base Station Kit”, provided by an associated proposal, to the testbed to complement an existing Cisco/Navini WiMax base station. It will add a mobility services engine to the testbed, and enhance the user nodes, to allow the testbed to support a wide range of wireless experiments. It will provide a unique trial mechanism for opt-in users in the broader Madison area.

Current Capabilities

Visit http://cs.wisc.edu/wings/projects/geni/ for more information

Milestones

MilestoneDate(WIMXUWI: S2.a Initial integration of static and mobile nodes in MadBed testbed with ORBIT)?

MilestoneDate(WIMXUWI: S2.b Implementation and deployment of user trial nodes enhanced with Mobile Access Router (MAR))?

MilestoneDate(WIMXUWI: S3.a Demonstration at GEC9 and Experimenter Outreach)?
MilestoneDate(WIMXUWI: S3.b Documentation and Code Release)?
MilestoneDate(WIMXUWI: S3.c Demonstration at GEC10 and Experimenter Outreach)?
MilestoneDate(WIMXUWI: S3.d Documentation and Code Release)?
MilestoneDate(WIMXUWI: S3.e Demonstration at GEC11 and Experimenter Outreach)?
MilestoneDate(WIMXUWI: S3.f Documentation and code release)?

Campus Installation Checklist

University of Wisconsin

Contact(s):
PI: Suman Banerjee suman@cs.wisc.edu

Cisco Base Station
Step Description Status Comment
1 Identify Outdoor Site on Campus Completed On top of the Computer Science building.
2 Obtain FCC License Completed Have license owned by Educational Communications Board, using it with Cisco base station.
3 Identify Indoor Equipment Room on Campus Completed -
4 Install Wiring at Outdoor Site and to Indoor Equipment Room Completed -
5 Install Pole at Outdoor Site and Ground Completed -
6 Install Antenna at Outdoor Site Completed -
7 Install Base Station Outdoor Unit Completed -
8 Complete Wiring at Outdoor Site and to Indoor Equipment Room Completed -
9 Install Indoor Equipment Racks and Ground Completed -
10 Install 120VAC and -48VDC Power Feeds and/or Supplies Completed -
11 Install Base Station Indoor Unit Completed -
12 Complete Wiring of Base Station Indoor Unit Completed -
13 Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units - -
14 Install Ethernet (VLAN) Switch, or Identify Existing Capacity - -
15 Install Linux Server(s) and Software - -
16 Connect Backbone Network - -
17 Provide Reference Client Platform - -
18 Initial Check-Out of Campus WiMAX Testbed - -


NEC Base Station 1
Step Description Status Comment
1 Identify Outdoor Site on Campus Completed On top of the Waisman Center.
2 Obtain FCC License Completed -
3 Identify Indoor Equipment Room on Campus Completed -
4 Install Wiring at Outdoor Site and to Indoor Equipment Room Completed -
5 Install Pole at Outdoor Site and Ground Completed -
6 Install Antenna at Outdoor Site Completed -
7 Install Base Station Outdoor Unit Completed -
8 Complete Wiring at Outdoor Site and to Indoor Equipment Room Completed -
9 Install Indoor Equipment Racks and Ground Completed -
10 Install 120VAC and -48VDC Power Feeds and/or Supplies Completed -
11 Install Base Station Indoor Unit Completed -
12 Complete Wiring of Base Station Indoor Unit Completed -
13 Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units Completed -
14 Install Ethernet (VLAN) Switch, or Identify Existing Capacity Completed -
15 Install Linux Server(s) and Software Completed -
16 Connect Backbone Network - -
17 Provide Reference Client Platform - -
18 Initial Check-Out of Campus WiMAX Testbed - -


NEC Base Station 2
Step Description Status Comment
1 Identify Outdoor Site on Campus Planned Currently planned on the Helen C. White building. Still waiting for approvals.
2 Obtain FCC License - -
3 Identify Indoor Equipment Room on Campus - -
4 Install Wiring at Outdoor Site and to Indoor Equipment Room - -
5 Install Pole at Outdoor Site and Ground - -
6 Install Antenna at Outdoor Site - -
7 Install Base Station Outdoor Unit - -
8 Complete Wiring at Outdoor Site and to Indoor Equipment Room - -
9 Install Indoor Equipment Racks and Ground - -
10 Install 120VAC and -48VDC Power Feeds and/or Supplies - -
11 Install Base Station Indoor Unit - -
12 Complete Wiring of Base Station Indoor Unit - -
13 Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units - -
14 Install Ethernet (VLAN) Switch, or Identify Existing Capacity - -
15 Install Linux Server(s) and Software - -
16 Connect Backbone Network - -
17 Provide Reference Client Platform - -
18 Initial Check-Out of Campus WiMAX Testbed - -


Project Technical Documents

Quarterly Status Reports

Spiral 2 Review
2011 Q1 Status Report

Spiral 2 Connectivity

Related Projects

Open GENI WiMAX Base Station Kit for Campus Deployments

Attachments (4)