Project Number
1731
Project Title
WiMax Deployment in the DOME and ViSE Testbeds and Cluster-D Framework
a.k.a WIMXUMASS
Technical Contacts
PI: Mark Corner, UMass Amherst, mcorner email at cs.umass.edu
Research Staff: Brian Lynn, UMass Amherst, blynn email at cs.umass.edu
Participating Organizations
University of Massachsetts at Amherst CS Dept.
GPO Liaison System Engineer
Harry Mussman hmussman@geni.net
Scope
This project will deploy an NEC WiMax base station (provided by Rutgers through an associated WiMax base station proposal) on a building located at UMass Amherst, and deploy WiMax client stations on mobile vehicles to enhance our existing GENI DOME testbed.
Current Capabilities
Milestones
MilestoneDate(WIMXCOLUM: S2.a WiMax base station installed and operational)?
Campus Installation Checklist
UMass Amherst
Contact(s):
PI: Mark Corner, UMass Amherst, mcorner email at cs.umass.edu
Research Staff: Brian Lynn, UMass Amherst, blynn email at cs.umass.edu
Step | Description | Planned | Started | Completed | Comment |
1 | Identify Outdoor Site on Campus | - | - | 12/09 | Three sites: top of library building, 20 stories; top of graduate research center building, few stories; top of CS building |
2 | Obtain FCC License | - | Applied 12/09 | Granted 03/2010 | IT has license that they want to retain |
3 | Identify Indoor Equipment Room on Campus | - | - | 12/09 | Three options: equipment room in library building; equipment room in graduate research center building; ? in CS building |
4 | Install Wiring at Outdoor Site and to Indoor Equipment Room | - | - | - | |
5 | Install Pole at Outdoor Site and Ground | - | - | - | |
6 | Install Antenna at Outdoor Site | - | - | - | |
7 | Install Base Station Outdoor Unit | - | - | - | |
8 | Complete Wiring at Outdoor Site and to Indoor Equipment Room | - | - | - | |
9 | Install Indoor Equipment Racks and Ground | - | - | - | |
10 | Install 120VAC and -48VDC Power Feeds and/or Supplies | - | - | - | |
11 | Install Base Station Indoor Unit | - | - | - | |
12 | Complete Wiring of Base Station Indoor Unit | - | - | - | |
13 | Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units | - | - | - | |
14 | Install Ethernet (VLAN) Switch, or Identify Existing Capacity | - | - | - | |
15 | Install Linux Server(s) and Software | - | - | - | |
16 | Connect Backbone Network | - | - | - | |
17 | Provide Reference Client Platform | - | - | - | |
18 | Initial Check-Out of Campus WiMAX Testbed | - | - | - |
Project Technical Documents
Quarterly Status Reports
Spiral 2 Connectivity
Related Projects
Attachments (1)
-
DOME-WiMAX-2010.pdf (2.0 MB) - added by 14 years ago.
Review slides for September 1, 2010