Version 2 (modified by 15 years ago) (diff) | ,
---|
Project Number
1731
Project Title
WiMax Deployment in the DOME and ViSE Testbeds and Cluster-D Framework
a.k.a WIMXUMASS
Technical Contacts
PI: Mark Corner, UMass Amherst, mcorner email at cs.umass.edu
Research Staff: Brian Lynn, UMass Amherst, blynn email at cs.umass.edu
Participating Organizations
University of Massachsetts at Amherst CS Dept.
GPO Liaison System Engineer
Harry Mussman hmussman@geni.net
Scope
This project will deploy an NEC WiMax base station (provided by Rutgers through an associated WiMax base station proposal) on a building located at UMass Amherst, and deploy WiMax client stations on mobile vehicles to enhance our existing GENI DOME testbed.
Current Capabilities
Milestones
MilestoneDate(WIMXCOLUM: S2.a WiMax base station installed and operational)?
Campus Installation Checklist
UMass Amherst
Contact(s):
PI: Mark Corner, UMass Amherst, mcorner email at cs.umass.edu
Step 1) Identify Outdoor Site on Campus: planned/started/completed x/x/10
Step 2) Obtain FCC License: planned/started/completed x/x/10
Step 3) Identify Indoor Equipment Room on Campus: planned/started/completed x/x/10
Step 4) Install Wiring at Outdoor Site and to Indoor Equipment Room: planned/started/completed x/x/10
Step 5) Install Pole at Outdoor Site and Ground: planned/started/completed x/x/10
Step 6) Install Antenna at Outdoor Site: planned/started/completed x/x/10
Step 7) Install Base Station Outdoor Unit: planned/started/completed x/x/10
Step 8) Complete Wiring at Outdoor Site and to Indoor Equipment Room: planned/started/completed x/x/10
Step 9) Install Indoor Equipment Racks and Ground: planned/started/completed x/x/10
Step 10) Install 120VAC and -48VDC Power Feeds and/or Supplies: planned/started/completed x/x/10
Step 11) Install Base Station Indoor Unit: planned/started/completed x/x/10
Step 12) Complete Wiring of Base Station Indoor Unit: planned/started/completed x/x/10
Step 13) Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units: planned/started/completed x/x/10
Step 14) Install Ethernet (VLAN) Switch, or Identify Existing Capacity: planned/started/completed x/x/10
Step 15) Install Linux Server(s) and Software: planned/started/completed x/x/10
Step 16) Connect Backbone Network: planned/started/completed x/x/10
Step 17) Provide Reference Client Platform: planned/started/completed x/x/10
Step 18) Inital Check-Out of Campus WiMAX Testbed: planned/started/completed x/x/10
Project Technical Documents
Quarterly Status Reports
Spiral 2 Connectivity
Related Projects
Attachments (1)
-
DOME-WiMAX-2010.pdf (2.0 MB) - added by 14 years ago.
Review slides for September 1, 2010
Download all attachments as: .zip