[[PageOutline]] == Project Number == 1731 == Project Title == WiMax Deployment in the DOME and ViSE Testbeds and Cluster-D Framework[[BR]] a.k.a WIMXUMASS === Technical Contacts === PI: Mark Corner, UMass Amherst, mcorner email at cs.umass.edu [[BR]] Research Staff: Brian Lynn, UMass Amherst, blynn email at cs.umass.edu [[BR]] === Participating Organizations === [http://prisms.cs.umass.edu/ University of Massachsetts at Amherst CS Dept.][[BR]] === Related Projects === [wiki:WIMXRG Open GENI WiMAX Base Station Kit for Campus Deployments][[BR]] === GPO Liaison System Engineer === Harry Mussman hmussman@geni.net == Scope == This project will deploy an NEC WiMax base station (provided by Rutgers through an associated WiMax base station proposal) on a building located at UMass Amherst, and deploy WiMax client stations on mobile vehicles to enhance our existing GENI DOME testbed. == Current Capabilities == === Milestones === == Spiral 4 == * [[MilestoneDate(WIMXUMASS: S4.a Demonstration at GEC12 and Experimenter Outreach)]] * [[MilestoneDate(WIMXUMASS: S4.b Documentation and Code Release)]] * [[MilestoneDate(WIMXUMASS: S4.c Demonstration at GEC13 and Experimenter Outreach)]] * [[MilestoneDate(WIMXUMASS: S4.d Documentation and Code Release)]] * [[MilestoneDate(WIMXUMASS: S4.e Demonstration at GEC14 and Experimenter Outreach)]] * [[MilestoneDate(WIMXUMASS: S4.f Final report and code release)]] === Campus Installation Checklist === UMass Amherst [[BR]] Contact(s): [[BR]] PI: Mark Corner, UMass Amherst, mcorner email at cs.umass.edu [[BR]] Research Staff: Brian Lynn, UMass Amherst, blynn email at cs.umass.edu [[BR]] || Step || Description || Planned || Started || Completed || Comment || || 1 || Identify Outdoor Site on Campus || - || - || 12/09 || Three sites: top of library building, 20 stories; top of graduate research center building, few stories; top of CS building || || 2 || Obtain FCC License || - || Applied 12/09 || Granted 03/2010 || IT has license that they want to retain || || 3 || Identify Indoor Equipment Room on Campus || - || - || 12/09 || Three options: equipment room in library building; equipment room in graduate research center building; ? in CS building || || 4 || Install Wiring at Outdoor Site and to Indoor Equipment Room || - || - || 05/11 || || || 5 || Install Pole at Outdoor Site and Ground || - || - || 05/11 || || || 6 || Install Antenna at Outdoor Site || - || - || 05/11 || || || 7 || Install Base Station Outdoor Unit || - || - || 05/11 || || || 8 || Complete Wiring at Outdoor Site and to Indoor Equipment Room || - || - || 05/11 || || || 9 || Install Indoor Equipment Racks and Ground || - || - || 05/11 || || || 10 || Install 120VAC and -48VDC Power Feeds and/or Supplies || - || - || 05/11 || || || 11 || Install Base Station Indoor Unit || - || - || 05/11 || || || 12 || Complete Wiring of Base Station Indoor Unit || - || - || 05/11 || || || 13 || Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units || - || - || 02/11 || || || 14 || Install Ethernet (VLAN) Switch, or Identify Existing Capacity || - || - || 05/11 || Connected to campus network. VLAN installation TBD; working with OIT. Purchased and installed router to connect to server that supports VLANs. || || 15 || Install Linux Server(s) and Software || - || - || 02/11 || || || 16 || Connect Backbone Network || - || - || 05/11 || || || 17 || Provide Reference Client Platform || - || - || 02/11 || || || 18 || Initial Check-Out of Campus WiMAX Testbed || - || - || 05/11 || || === Status Reports and Demos === [http://groups.geni.net/geni/attachment/wiki/WIMXUMASS/DOME-WiMAX-2010.pdf Spiral 2 Review][[BR]] [wiki:DOME-2010-GEC9-status "DOME: November 2010 Status Report"][[BR]] [wiki:DOME-2011-GEC10-status "DOME: March 2011 Status Report"][[BR]] [wiki:DOME-2011-GEC11-status "DOME: Final Spiral 3 Status Report"][[BR]] === Technical Documents === === Software Releases === === Connectivity ===