Project Number
1768
Project Title
Deploying GENI WiMax in Colorado
a.k.a WIMXUCO
Technical Contacts
PI: Dirk Grunwald Dirk.Grunwald@Colorado.edu
Research Assistant: Gary Yee
Participating Organizations
University of Colorado at Boulder CS Dept.
GPO Liaison System Engineer
Harry Mussman hmussman@geni.net
Scope
This proposal will install and maintain a programmable WiMax base station at one of the existing University of Colorado Wide-Area Radio Testbed (WART) wireless network sites. It will use a “GENI WiMax Base Station Kit” provided by Rutgers.
Current Capabilities
Milestones
MilestoneDate(WIMXCOLUM: S2.a Redesign remote management/power system)?
MilestoneDate(WIMXCOLUM: S2.b Install the WiMax base station kit and antennas)?
Campus Installation Checklist
University of Colorado at Boulder
Contact(s):
PI: Dirk Grunwald Dirk.Grunwald@Colorado.edu
Step | Description | Planned | Started | Completed | Comment |
1 | Identify Outdoor Site on Campus | - | Started | - | Have eight sites with 802.11 antennas, ranging from high (6km range) to low (within clutter of buildings) Another group on campus runs a WiMAX system inside a lab. |
2 | Obtain FCC License | - | Started | - | University has leased their license to Clearwire, but some use may still be possible |
3 | Identify Indoor Equipment Room on Campus | - | - | - | |
4 | Install Wiring at Outdoor Site and to Indoor Equipment Room | - | - | - | |
5 | Install Pole at Outdoor Site and Ground | - | - | - | |
6 | Install Antenna at Outdoor Site | - | - | - | |
7 | Install Base Station Outdoor Unit | - | - | - | |
8 | Complete Wiring at Outdoor Site and to Indoor Equipment Room | - | - | - | |
9 | Install Indoor Equipment Racks and Ground | - | - | - | |
10 | Install 120VAC and -48VDC Power Feeds and/or Supplies | - | - | - | |
11 | Install Base Station Indoor Unit | - | - | - | |
12 | Complete Wiring of Base Station Indoor Unit | - | - | - | |
13 | Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units | - | - | - | |
14 | Install Ethernet (VLAN) Switch, or Identify Existing Capacity | - | - | - | |
15 | Install Linux Server(s) and Software | - | - | - | |
16 | Connect Backbone Network | - | - | - | |
17 | Provide Reference Client Platform | - | - | - | |
18 | Initial Check-Out of Campus WiMAX Testbed | - | - | - |
Project Technical Documents
Quarterly Status Reports
Spiral 2 Connectivity
Related Projects
Attachments (1)
-
Spiral 2 Project Review template 9Jul10.pptx.pdf (854.3 KB) - added by 13 years ago.
Description of first year report (with antenna locations etc)
Download all attachments as: .zip