[[PageOutline]] == Project Number == 1768 == Project Title == Deploying GENI WiMax in Colorado[[BR]] a.k.a WIMXUCO === Technical Contacts === PI: Dirk Grunwald Dirk.Grunwald@Colorado.edu [[BR]] === Participating Organizations === [http://www.cs.colorado.edu/ University of Colorado at Boulder CS Dept.][[BR]] === GPO Liaison System Engineer === Harry Mussman hmussman@geni.net == Scope == This proposal will install and maintain a programmable WiMax base station at one of the existing University of Colorado Wide-Area Radio Testbed (WART) wireless network sites. It will use a “GENI WiMax Base Station Kit” provided by Rutgers. === Current Capabilities === === Milestones === [[MilestoneDate(WIMXCOLUM: S2.a Redesign remote management/power system)]][[BR]] [[MilestoneDate(WIMXCOLUM: S2.b Install the WiMax base station kit and antennas)]][[BR]] === Campus Installation Checklist === University of Colorado at Boulder [[BR]] Contact(s): [[BR]] PI: Dirk Grunwald Dirk.Grunwald@Colorado.edu [[BR]] Step 1) Identify Outdoor Site on Campus: planned/started/completed x/x/10 [[BR]] Step 2) Obtain FCC License: planned/started/completed x/x/10 [[BR]] Step 3) Identify Indoor Equipment Room on Campus: planned/started/completed x/x/10 [[BR]] Step 4) Install Wiring at Outdoor Site and to Indoor Equipment Room: planned/started/completed x/x/10 [[BR]] Step 5) Install Pole at Outdoor Site and Ground: planned/started/completed x/x/10 [[BR]] Step 6) Install Antenna at Outdoor Site: planned/started/completed x/x/10 [[BR]] Step 7) Install Base Station Outdoor Unit: planned/started/completed x/x/10 [[BR]] Step 8) Complete Wiring at Outdoor Site and to Indoor Equipment Room: planned/started/completed x/x/10 [[BR]] Step 9) Install Indoor Equipment Racks and Ground: planned/started/completed x/x/10 [[BR]] Step 10) Install 120VAC and -48VDC Power Feeds and/or Supplies: planned/started/completed x/x/10 [[BR]] Step 11) Install Base Station Indoor Unit: planned/started/completed x/x/10 [[BR]] Step 12) Complete Wiring of Base Station Indoor Unit: planned/started/completed x/x/10 [[BR]] Step 13) Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units: planned/started/completed x/x/10 [[BR]] Step 14) Install Ethernet (VLAN) Switch, or Identify Existing Capacity: planned/started/completed x/x/10 [[BR]] Step 15) Install Linux Server(s) and Software: planned/started/completed x/x/10 [[BR]] Step 16) Connect Backbone Network: planned/started/completed x/x/10 [[BR]] Step 17) Provide Reference Client Platform: planned/started/completed x/x/10 [[BR]] Step 18) Inital Check-Out of Campus WiMAX Testbed: planned/started/completed x/x/10 [[BR]] == Project Technical Documents == === Quarterly Status Reports === === Spiral 2 Connectivity === === Related Projects === [wiki:WIMXRG Open GENI WiMAX Base Station Kit for Campus Deployments][[BR]]