[[PageOutline]] == Project Number == 1768 == Project Title == Deploying GENI WiMax in Colorado[[BR]] a.k.a WIMXUCO === Technical Contacts === PI: Dirk Grunwald Dirk.Grunwald@Colorado.edu [[BR]] Ph.D. Student: Caleb Phillips caleb.phillips@Colorado.EDU [[BR]] === Participating Organizations === [http://www.cs.colorado.edu/ University of Colorado at Boulder CS Dept.][[BR]] [http://systems.cs.colorado.edu/ Computer Science Systems Laboratory][[BR]] === Related Projects === [wiki:WIMXRG Open GENI WiMAX Base Station Kit for Campus Deployments][[BR]] === GPO Liaison System Engineer === Harry Mussman hmussman@geni.net == Scope == This proposal will install and maintain a programmable WiMax base station at one of the existing University of Colorado Wide-Area Radio Testbed (WART) wireless network sites. It will use a “GENI WiMax Base Station Kit” provided by Rutgers. == Current Capabilities == * Base Station is installed at 40.007422,-105.263173 with 120-degree sector pointed towards true-North. * As of 6/17/2011, PHY-layer is operational and transmitting, putting 40 dBm into the antenna cable. Demodulation achieved with an Anritsu Spectrum analyzer both at the base of the antenna (CINR =~ 45 dB) and 100m distant in the main lobe (CINR =~ 43 dB). === Milestones === [[MilestoneDate(WIMXCOLUM: S2.a Redesign remote management/power system)]][[BR]] [[MilestoneDate(WIMXCOLUM: S2.b Install the WiMax base station kit and antennas)]][[BR]] [[MilestoneDate(WIMXUCO: S3.a Demonstration at GEC9 and Experimenter Outreach)]] [[BR]] [[MilestoneDate(WIMXUCO: S3.b Documentation and Code Release)]] [[BR]] [[MilestoneDate(WIMXUCO: S3.c Demonstration at GEC10 and Experimenter Outreach)]] [[BR]] [[MilestoneDate(WIMXUCO: S3.d Documentation and Code Release)]] [[BR]] [[MilestoneDate(WIMXUCO: S3.e Demonstration at GEC11 and Experimenter Outreach)]] [[BR]] [[MilestoneDate(WIMXUCO: S3.f Documentation and code release)]] [[BR]] === Campus Installation Checklist === University of Colorado at Boulder [[BR]] Contact(s): [[BR]] PI: Dirk Grunwald Dirk.Grunwald@Colorado.edu [[BR]] || Step || Description || Planned || Started || Completed || Comment || || 1 || Identify Outdoor Site on Campus || - || - || X|| Chosen site is on the roof of the Engineering Center Office Tower (ECOT) || || 2 || Obtain FCC License || - || - || X || Operating (legally) at 2.5 GHz || || 3 || Identify Indoor Equipment Room on Campus || - || - || X || IDU and ASN-Gateway are located in a wall-mounted NEMA-4 enclosure on the roof. || || 4 || Install Wiring at Outdoor Site and to Indoor Equipment Room || - || - || X || Completed by contractor. || || 5 || Install Pole at Outdoor Site and Ground || - || - || X || Completed by contractor. || || 6 || Install Antenna at Outdoor Site || - || - || X || Completed by contractor. Aimed at true north with 2-degrees mechanical down-tilt. || || 7 || Install Base Station Outdoor Unit || - || - || X || Completed by Contractor || || 8 || Complete Wiring at Outdoor Site and to Indoor Equipment Room || - || - || X || Completed by Contractor || || 9 || Install Indoor Equipment Racks and Ground || - || - || X || Completed by Contractor || || 10 || Install 120VAC and -48VDC Power Feeds and/or Supplies || - || - || X || Completed by Contractor || || 11 || Install Base Station Indoor Unit || - || - || X || Completed by Contractor || || 12 || Complete Wiring of Base Station Indoor Unit || - || - || X || Completed by Contractor || || 13 || Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units || - || - || X || Not sure what this means, but yes? || || 14 || Install Ethernet (VLAN) Switch, or Identify Existing Capacity || - || - || X || Completed after negotiations with ITS. || || 15 || Install Linux Server(s) and Software || - || - || X || Completed with help from Ivan. || || 16 || Connect Backbone Network || - || - || X || ASN-Gateway is accessible at 128.138.224.29 || || 17 || Provide Reference Client Platform || X || - || - || Working with Intel chipset with some agony. || || 18 || Initial Check-Out of Campus WiMAX Testbed || X || - || - || PHY-Level measurements demonstrate functionality. Need to try client-connectivity and throughput testing. Still need to get GRE tunnel/routing working. || === Quarterly Status Reports === [http://groups.geni.net/geni/attachment/wiki/WIMXUCO/Spiral%202%20Project%20Review%20template%209Jul10.pptx.pdf Spiral 2 Review][[BR]] === Technical Documents === No technical documents at the moment. === Software Releases === No software at the moment. === Connectivity ===