58 | | || 1 || Identify Outdoor Site on Campus || - || Started || -|| Have eight sites with 802.11 antennas, ranging from high (6km range) to low (within clutter of buildings) Another group on campus runs a WiMAX system inside a lab.|| |
59 | | || 2 || Obtain FCC License || - || Started || - || University has leased their license to Clearwire, but some use may still be possible || |
60 | | || 3 || Identify Indoor Equipment Room on Campus || - || - || - || || |
61 | | || 4 || Install Wiring at Outdoor Site and to Indoor Equipment Room || - || - || - || || |
62 | | || 5 || Install Pole at Outdoor Site and Ground || - || - || - || || |
63 | | || 6 || Install Antenna at Outdoor Site || - || - || - || || |
64 | | || 7 || Install Base Station Outdoor Unit || - || - || - || || |
65 | | || 8 || Complete Wiring at Outdoor Site and to Indoor Equipment Room || - || - || - || || |
66 | | || 9 || Install Indoor Equipment Racks and Ground || - || - || - || || |
67 | | || 10 || Install 120VAC and -48VDC Power Feeds and/or Supplies || - || - || - || || |
68 | | || 11 || Install Base Station Indoor Unit || - || - || - || || |
69 | | || 12 || Complete Wiring of Base Station Indoor Unit || - || - || - || || |
70 | | || 13 || Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units || - || - || - || || |
71 | | || 14 || Install Ethernet (VLAN) Switch, or Identify Existing Capacity || - || - || - || || |
72 | | || 15 || Install Linux Server(s) and Software || - || - || - || || |
73 | | || 16 || Connect Backbone Network || - || - || - || || |
74 | | || 17 || Provide Reference Client Platform || - || - || - || || |
75 | | || 18 || Initial Check-Out of Campus WiMAX Testbed || - || - || - || || |
76 | | |
77 | | |
| 59 | || 1 || Identify Outdoor Site on Campus || - || - || X|| Chosen site is on the roof of the Engineering Center Office Tower (ECOT) || |
| 60 | || 2 || Obtain FCC License || - || - || X || Operating (legally) at 2.5 GHz || |
| 61 | || 3 || Identify Indoor Equipment Room on Campus || - || - || X || IDU and ASN-Gateway are located in a wall-mounted NEMA-4 enclosure on the roof. || |
| 62 | || 4 || Install Wiring at Outdoor Site and to Indoor Equipment Room || - || - || X || Completed by contractor. || |
| 63 | || 5 || Install Pole at Outdoor Site and Ground || - || - || X || Completed by contractor. || |
| 64 | || 6 || Install Antenna at Outdoor Site || - || - || X || Completed by contractor. Aimed at true north with 2-degrees mechanical down-tilt. || |
| 65 | || 7 || Install Base Station Outdoor Unit || - || - || X || Completed by Contractor || |
| 66 | || 8 || Complete Wiring at Outdoor Site and to Indoor Equipment Room || - || - || X || Completed by Contractor || |
| 67 | || 9 || Install Indoor Equipment Racks and Ground || - || - || X || Completed by Contractor || |
| 68 | || 10 || Install 120VAC and -48VDC Power Feeds and/or Supplies || - || - || X || Completed by Contractor || |
| 69 | || 11 || Install Base Station Indoor Unit || - || - || X || Completed by Contractor || |
| 70 | || 12 || Complete Wiring of Base Station Indoor Unit || - || - || X || Completed by Contractor || |
| 71 | || 13 || Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units || - || - || X || Not sure what this means, but yes? || |
| 72 | || 14 || Install Ethernet (VLAN) Switch, or Identify Existing Capacity || - || - || X || Completed after negotiations with ITS. || |
| 73 | || 15 || Install Linux Server(s) and Software || - || - || X || Completed with help from Ivan. || |
| 74 | || 16 || Connect Backbone Network || - || - || X || ASN-Gateway is accessible at 128.138.224.29 || |
| 75 | || 17 || Provide Reference Client Platform || X || - || - || Working with Intel chipset with some agony. || |
| 76 | || 18 || Initial Check-Out of Campus WiMAX Testbed || X || - || - || PHY-Level measurements demonstrate functionality. Need to try client-connectivity and throughput testing. Still need to get GRE tunnel/routing working. || |