  • WIMXUCO

    v12 v13  
    1313
    1414PI: Dirk Grunwald  Dirk.Grunwald@Colorado.edu [[BR]]
    15 Research Assistant:  Gary Yee   gary.yee@Colorado.EDU [[BR]]
     15Ph.D. Student:  Caleb Phillips  caleb.phillips@Colorado.EDU [[BR]]
    1616
    1717=== Participating Organizations ===
    1818
    1919[http://www.cs.colorado.edu/  University of Colorado at Boulder CS Dept.][[BR]]
     20[http://systems.cs.colorado.edu/  Computer Science Systems Laboratory][[BR]]
    2021
    2122=== Related Projects ===
     
    2728Harry Mussman  hmussman@geni.net
    2829
    29 
    3030== Scope ==
    3131
     
    3434== Current Capabilities ==
    3535
     36  * Base Station is installed at 40.007422,-105.263173 with 120-degree sector pointed towards true-North.
     37  * As of 6/17/2011, PHY-layer is operational and transmitting, putting 40 dBm into the antenna cable. Demodulation achieved with an Anritsu Spectrum analyzer both at the base of the antenna (CINR =~ 45 dB) and 100m distant in the main lobe (CINR =~ 43 dB).
    3638
    3739=== Milestones ===
     
    3941[[MilestoneDate(WIMXCOLUM: S2.a Redesign remote management/power system)]][[BR]]
    4042[[MilestoneDate(WIMXCOLUM: S2.b Install the WiMax base station kit and antennas)]][[BR]]
    41 
    4243[[MilestoneDate(WIMXUCO: S3.a Demonstration at GEC9 and Experimenter Outreach)]] [[BR]]
    4344[[MilestoneDate(WIMXUCO: S3.b Documentation and Code Release)]] [[BR]]
     
    5657
    5758|| Step || Description || Planned || Started || Completed || Comment ||
    58 ||   1  || Identify Outdoor Site on Campus || - || Started  || -|| Have eight sites with 802.11 antennas, ranging from high (6km range) to low (within clutter of buildings)  Another group on campus runs a WiMAX system inside a lab.||
    59 || 2 || Obtain FCC License || - || Started || - || University has leased their license to Clearwire, but some use may still be possible ||
    60 || 3 || Identify Indoor Equipment Room on Campus || - || - || - || ||
    61 || 4 || Install Wiring at Outdoor Site and to Indoor Equipment Room || - || - || - || ||
    62 || 5 || Install Pole at Outdoor Site and Ground  || - || - || - || ||
    63 || 6 || Install Antenna at Outdoor Site  || - || - || - || ||
    64 || 7 || Install Base Station Outdoor Unit  || - || - || - || ||
    65 || 8 || Complete Wiring at Outdoor Site and to Indoor Equipment Room  || - || - || - || ||
    66 || 9 || Install Indoor Equipment Racks and Ground  || - || - || - || ||
    67 || 10 || Install 120VAC and -48VDC Power Feeds and/or Supplies  || - || - || - || ||
    68 || 11 || Install Base Station Indoor Unit  || - || - || - || ||
    69 || 12 || Complete Wiring of Base Station Indoor Unit  || - || - || - || ||
    70 || 13 || Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units  || - || - || - || ||
    71 || 14 || Install Ethernet (VLAN) Switch, or Identify Existing Capacity  || - || - || - || ||
    72 || 15 || Install Linux Server(s) and Software || - || - || - || ||
    73 || 16 || Connect Backbone Network  || - || - || - || ||
    74 || 17 || Provide Reference Client Platform  || - || - || - || ||
    75 || 18 || Initial Check-Out of Campus WiMAX Testbed  || - || - || - || ||
    76 
    77 
     59||   1  || Identify Outdoor Site on Campus || - || -  || X|| Chosen site is on the roof of the Engineering Center Office Tower (ECOT) ||
     60|| 2 || Obtain FCC License || - || - || X || Operating (legally) at 2.5 GHz ||
     61|| 3 || Identify Indoor Equipment Room on Campus || - || - || X || IDU and ASN-Gateway are located in a wall-mounted NEMA-4 enclosure on the roof. ||
     62|| 4 || Install Wiring at Outdoor Site and to Indoor Equipment Room || - || - || X || Completed by contractor. ||
     63|| 5 || Install Pole at Outdoor Site and Ground  || - || - || X || Completed by contractor. ||
     64|| 6 || Install Antenna at Outdoor Site  || - || - || X || Completed by contractor. Aimed at true north with 2-degrees mechanical down-tilt. ||
     65|| 7 || Install Base Station Outdoor Unit  || - || - || X || Completed by Contractor ||
     66|| 8 || Complete Wiring at Outdoor Site and to Indoor Equipment Room  || - || - || X || Completed by Contractor ||
     67|| 9 || Install Indoor Equipment Racks and Ground  || - || - || X || Completed by Contractor ||
     68|| 10 || Install 120VAC and -48VDC Power Feeds and/or Supplies  || - || - || X || Completed by Contractor ||
     69|| 11 || Install Base Station Indoor Unit  || - || - || X || Completed by Contractor ||
     70|| 12 || Complete Wiring of Base Station Indoor Unit  || - || - || X || Completed by Contractor ||
     71|| 13 || Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units  || - || - || X || Not sure what this means, but yes? ||
     72|| 14 || Install Ethernet (VLAN) Switch, or Identify Existing Capacity  || - || - || X || Completed after negotiations with ITS. ||
     73|| 15 || Install Linux Server(s) and Software || - || - || X || Completed with help from Ivan. ||
     74|| 16 || Connect Backbone Network  || - || - || X || ASN-Gateway is accessible at 128.138.224.29 ||
     75|| 17 || Provide Reference Client Platform  || X || - || - || Working with Intel chipset with some agony. ||
     76|| 18 || Initial Check-Out of Campus WiMAX Testbed  || X || - || - || PHY-Level measurements demonstrate functionality. Need to try client-connectivity and throughput testing. Still need to get GRE tunnel/routing working. ||
    7877
    7978=== Quarterly Status Reports ===
     
    8180[http://groups.geni.net/geni/attachment/wiki/WIMXUCO/Spiral%202%20Project%20Review%20template%209Jul10.pptx.pdf  Spiral 2 Review][[BR]]
    8281
     82=== Technical Documents ===
    8383
    84 === Technical Documents ===
     84No technical documents at the moment.
    8585
    8686=== Software Releases ===
    8787
     88No software at the moment.
     89
    8890=== Connectivity ===
    89