Version 6 (modified by 14 years ago) (diff) | ,
---|
Project Number
1797
Project Title
C-VeT --UCLA Campus Vehicular Testbed: An Open Platform for Vehicular Networking
a.k.a WIMXUCLA
Technical Contacts
PI: Mario Gerla gerla@cs.ucla.edu
Giovanni Pau
Participating Organizations
UCLA CS Dept, Los Angeles, CA
GPO Liaison System Engineer
Harry Mussman hmussman@geni.net
Scope
This project will add WiMax capability to a Campus Vehicular Testbed (C-VeT) to support the deployment and testing of vehicular services and applications over both WiFi and WiMax. It will feature resource virtualization in order to enable shared access by multiple experimenters using the ORBIT Management Framework (OMF). To establish the WiMax capability, we will procure a “GENI WiMax base station kit”.
Current Capabilities
Milestones
MilestoneDate(WIMXUCLA: S2.a Begin deployment of dual-mode vehicular nodes (WiFi and WiMax))?
Campus Installation Checklist
UCLA
Contact(s):
PI: Mario Gerla gerla@cs.ucla.edu
Step 1) Identify Outdoor Site on Campus: planned/started/completed x/x/10
Step 2) Obtain FCC License: planned/started/completed x/x/10
Step 3) Identify Indoor Equipment Room on Campus: planned/started/completed x/x/10
Step 4) Install Wiring at Outdoor Site and to Indoor Equipment Room: planned/started/completed x/x/10
Step 5) Install Pole at Outdoor Site and Ground: planned/started/completed x/x/10
Step 6) Install Antenna at Outdoor Site: planned/started/completed x/x/10
Step 7) Install Base Station Outdoor Unit: planned/started/completed x/x/10
Step 8) Complete Wiring at Outdoor Site and to Indoor Equipment Room: planned/started/completed x/x/10
Step 9) Install Indoor Equipment Racks and Ground: planned/started/completed x/x/10
Step 10) Install 120VAC and -48VDC Power Feeds and/or Supplies: planned/started/completed x/x/10
Step 11) Install Base Station Indoor Unit: planned/started/completed x/x/10
Step 12) Complete Wiring of Base Station Indoor Unit: planned/started/completed x/x/10
Step 13) Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units: planned/started/completed x/x/10
Step 14) Install Ethernet (VLAN) Switch, or Identify Existing Capacity: planned/started/completed x/x/10
Step 15) Install Linux Server(s) and Software: planned/started/completed x/x/10
Step 16) Connect Backbone Network: planned/started/completed x/x/10
Step 17) Provide Reference Client Platform: planned/started/completed x/x/10
Step 18) Inital Check-Out of Campus WiMAX Testbed: planned/started/completed x/x/10
Project Technical Documents
Quarterly Status Reports
Spiral 2 Connectivity
Related Projects
Attachments (2)
-
UCLA-WIMAX-Spiral2ProjectReview.pptx.pdf (5.8 MB) - added by 14 years ago.
Spiral 2 - Project Review Presentation
-
C-VeT-General-Presentation.pptx.pdf (14.2 MB) - added by 14 years ago.
C-VeT: Introductory Presentation