Changes between Version 14 and Version 15 of WIMXUCLA
- Timestamp:
- 08/31/10 20:03:29 (14 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
WIMXUCLA
v14 v15 48 48 || Step || Description || Planned || Started || Completed || Comment || 49 49 || 1 || Identify Outdoor Site on Campus || - || Completed || -|| Identified 2 locations: 1 on the hill: Sproul Hall one of the student housing building; the second one on Boelter Hall CSD. Initial Setup on Boelter Hall for Testing purposes. The WiFi sites are 6 and they cover the whole campus; topology posted as picture below. || 50 || 2 || Obtain FCC License || - || Completed || - || 2 Year License Granted, Additional years if needed will be requested. The license has 2 frequencies 2,57 5MHz an 2,590MHz. 2 Campus Locations are authorized to transmit.||50 || 2 || Obtain FCC License || - || Completed || - || 2 Year License Granted, Additional years if needed will be requested. The license has 2 frequencies 2,572MHz an 2,590MHz. 2 Campus Locations are authorized to transmit.|| 51 51 || 3 || Identify Indoor Equipment Room on Campus || - || Completed || - ||2 Locations 1 in Boelter Hall and 1 in Sproul Hall.|| 52 52 || 4 || Install Wiring at Outdoor Site and to Indoor Equipment Room || - || Started || - ||Indoor Completed. Outdoor completion expected on 9/20- pending Tower Arrival||