    77== Project Title ==
    88
    9 Open GENI WiMax Base Station Kit for Campus Deployments[[BR]]
     9Open GENI !WiMax Base Station Kit for Campus Deployments[[BR]]
    1010a.k.a. WIMXRG
    1111
     
    2323== Scope ==
    2424
    25 This project is aimed at the development, procurement and software support of a GENI-enabled WiMax base station equipment kit for deployment on seven campuses. This is follow-on to the current Spiral 1 project on the prototyping and trial deployment of an open GENI WiMax 802.16e base station. The project leverages a commercial 802.16e base station from NEC, replacing the standard WiMax controller with an open GENI software implementation that supports virtualization and layer 2/3 programmability.
     25This project is aimed at the development, procurement and software support of a GENI-enabled !WiMax base station equipment kit for deployment on seven campuses. This is follow-on to the current Spiral 1 project on the prototyping and trial deployment of an open GENI !WiMax 802.16e base station. The project leverages a commercial 802.16e base station from NEC, replacing the standard !WiMax controller with an open GENI software implementation that supports virtualization and layer 2/3 programmability.
    2626
    2727=== Current Capabilities ===
     
    2929=== Milestones ===
    3030
    31 Develop installation and operation guidelines for campus WiMax. (Due March 2010)[[BR]]
    32 Procure and deliver WiMax base station kits to two other campuses.   (Due July 2010)[[BR]]
    33 Procure and deliver WiMax base station kit to GPO integration lab (subject to equipment availability)[[BR]]
    34 Upgrade WiMax base station software (GBSN v3.0) and provide field support.  (Due May 2010)[[BR]]
     31Develop installation and operation guidelines for campus !WiMax. (Due March 2010)[[BR]]
     32Procure and deliver !WiMax base station kits to two other campuses.   (Due July 2010)[[BR]]
     33Procure and deliver !WiMax base station kit to GPO integration lab (subject to equipment availability)[[BR]]
     34Upgrade !WiMax base station software (GBSN v3.0) and provide field support.  (Due May 2010)[[BR]]
    3535Complete initial multi-campus demo with at least two sites (Due September 2010)[[BR]]