[[PageOutline]] == Project Number == 1751 == Project Title == Campus deployment of an open GENI WiMAX 802.16e Testbed in Polytechnic Institute of NYU[[BR]] a.k.a WIMXNYUPT === Technical Contacts === PI: Thanasis Korakis korakis@poly.edu [[BR]] === Participating Organizations === [http://www.poly.edu Polytechnic University of NYU, Brooklyn, NY][[BR]] === GPO Liaison System Engineer === Harry Mussman hmussman@geni.net == Scope == This project builds an open/programmable !WiMax testbed on the campus of Polytechnic University of NYU. It utilizes the "Open GENI !WiMax Base Station Kit for Campus Deployments" provided by an associated project (Rutgers and NEC). It provides for the installation, maintenance and integration of the !WiMax base station kit with existing experimentation facilities at the university. === Current Capabilities === === Milestones === [[MilestoneDate(WIMXNYUPT: S2.a Complete Installation)]][[BR]] [[MilestoneDate(WIMXNYUPT: S2.b Multi-campus Demo)]][[BR]] [[MilestoneDate(WIMXNYUPT: S3.a Demonstration at GEC9 and Experimenter Outreach)]] [[BR]] [http://vimeo.com/16742046 ParkNet demo at GEC9 (video)][[BR]] [[MilestoneDate(WIMXNYUPT: S3.b Documentation and Code Release)]] [[BR]] [[MilestoneDate(WIMXNYUPT: S3.c Demonstration at GEC10 and Experimenter Outreach)]] [[BR]] [[MilestoneDate(WIMXNYUPT: S3.d Documentation and Code Release)]] [[BR]] [[MilestoneDate(WIMXNYUPT: S3.e Demonstration at GEC11 and Experimenter Outreach)]] [[BR]] [[MilestoneDate(WIMXNYUPT: S3.f Documentation and code release)]] [[BR]] === Campus Installation Checklist === Polytechnic University of NYU [[BR]] Contact(s): [[BR]] PI: Thanasis Korakis korakis@poly.edu [[BR]] || Step || Description || Planned || Started || Completed || Comment || || 1 || Identify Outdoor Site on Campus || - || Started || Completed || Roof of the ECE building || || 2 || Obtain FCC License || - || Started || Completed || || || 3 || Identify Indoor Equipment Room on Campus || - || Started || Completed || Networking room of the Library in the ECE building || || 4 || Install Wiring at Outdoor Site and to Indoor Equipment Room || - || Started || Completed || || || 5 || Install Pole at Outdoor Site and Ground || - || Started || Completed || || || 6 || Install Antenna at Outdoor Site || - || Started || Completed || || || 7 || Install Base Station Outdoor Unit || - || Started || Completed || || || 8 || Complete Wiring at Outdoor Site and to Indoor Equipment Room || - || Started || Completed || || || 9 || Install Indoor Equipment Racks and Ground || - || Started || Completed || || || 10 || Install 120VAC and -48VDC Power Feeds and/or Supplies || - || Started || Completed || || || 11 || Install Base Station Indoor Unit || - || Started || Completed || || || 12 || Complete Wiring of Base Station Indoor Unit || - || Started || Completed || || || 13 || Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units || - ||Started || Completed || || || 14 || Install Ethernet (VLAN) Switch, or Identify Existing Capacity || - || Started || Completed || || || 15 || Install Linux Server(s) and Software || - || Started || Completed || || || 16 || Connect Backbone Network || - || Started || Completed || || || 17 || Provide Reference Client Platform || - || Started || Completed || || || 18 || Initial Check-Out of Campus WiMAX Testbed || - || Started || Completed || || == Project Technical Documents == === Quarterly Status Reports === [http://groups.geni.net/geni/attachment/wiki/WIMXNYUPT/GENI_WiMAX_Poly_review_Sept_2010.pdf Spiral 2 Review][[BR]] === Spiral 2 Connectivity === === Related Projects === [wiki:WIMXRG Open GENI WiMAX Base Station Kit for Campus Deployments][[BR]]