wiki:WIMXCOLUM

Version 23 (modified by jmccolga@bbn.com, 13 years ago) (diff)

--

Project Number

1770

Project Title

GENI WiMAX Base Station Kit - Columbia University Deployment
a.k.a WIMXCOLUM

Technical Contacts

PI: Henning Schulzrinne hgs@cs.columbia.edu

Participating Organizations

Columbia University CS Dept, New York, NY

Related Projects

Open GENI WiMAX Base Station Kit for Campus Deployments

GPO Liaison System Engineer

Harry Mussman hmussman@geni.net

Scope

This project will install a GENI WiMAX Base Station Kit provided by Rutgers on the Columbia University campus, and operate it with the ORBIT Management Framework (OMF). It will enhance our WORKIT nodes with WiMAX clients and GPS capabilities, add remote control and virtualization capabilities, and operate them with OMF. It will also build teaching modules to explore wide area wireless network issues and applications.

Current Capabilities

Visit Columbia University WiMAX Campus Deployment and Installation for more information.

Milestones

Spiral 4

Campus Installation Checklist

Columbia University

Contact(s):
PI: Henning Schulzrinne hgs@cs.columbia.edu

Step Description Planned Started Completed Comment
1 Identify Outdoor Site on Campus - Started 09-30-10
12-09-10
Near southwest corner at Fairchild building rooftop 14fl
The outdoor site is supposed to be changed: Mudd building 14fl (the southwest corner of the wall)
(see expected coverage: WIMXCOLUM/CUWIMAX)
2 Obtain FCC License - Started 04-14-10
3 Identify Indoor Equipment Room on Campus - - 09-30-10
12-09-10
HAM radio station at Fairchild building 14fl
Changed indoor site: Same level inside of Mudd where antenna+ODU will be mounted.
4 Install Wiring at Outdoor Site and to Indoor Equipment Room - - -
5 Install Pole at Outdoor Site and Ground - - -
6 Install Antenna at Outdoor Site - - -
7 Install Base Station Outdoor Unit - - -
8 Complete Wiring at Outdoor Site and to Indoor Equipment Room - - -
9 Install Indoor Equipment Racks and Ground - - -
10 Install 120VAC and -48VDC Power Feeds and/or Supplies - - -
11 Install Base Station Indoor Unit - - -
12 Complete Wiring of Base Station Indoor Unit - - -
13 Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units - - -
14 Install Ethernet (VLAN) Switch, or Identify Existing Capacity - - -
15 Install Linux Server(s) and Software - - -
16 Connect Backbone Network - - -
17 Provide Reference Client Platform - - -
18 Initial Check-Out of Campus WiMAX Testbed - - -

Status Reports and Demos

Technical Documents

Software Releases =

Spiral 2 Connectivity

Attachments (1)

Download all attachments as: .zip