[[PageOutline]] = Columbia University WiMAX Campus Deployment and Installation = == 1. People == * Henning Shculzrinne (PI)[[BR]] * !SungHoon Seo (postdoctoral researcher)[[BR]] * Jan Janak (visiting scholar)[[BR]] == 2. TODOs == 1. Contact Facilities to mount pole mask and ODU on outdoor site 1. Request permission from Dean's office, facilities, and real-estate committee 1. Preliminary base station testing with Wi-Fi antenna by using signal power attenuator (it should be set with reduced (lowest) TX power 0 dBm) 1. Purchase additional necessary items 1. Ethernet activation (1402B) when all equipments are ready via Patrick (CUIT staff) 1. Check rack space (smaller size) for IDU and ASN-GW == 3. History == 1. Obtained FCC licence on Apr 14, 2010 1. Site survey on Jun 24 and Sep 30, 2010 - We chose Fairchild building rooftop (12 fl) for mounting WiMAX antenna + ODU and HAM radio station (14 fl) to install IDU+server(s). 1. The first WiMAX package arrived on Jun 16, 2010 - shipment from Rutgers University 1. Outdoor unit x 1 EA 1. GPS receiver antenna x 1 EA 1. Fiber cable x 1 ROLL (?? feet) 1. Sector antenna x 1 EA 1. Mounting brackets for ODU and the antenna x 1 SET 1. Power connector for the ODU x 1 EA 1. Ligthning surge protector for the WiMAX antenna x 1 EA 1. Buying required items (via Elias Tesfaye, officer in CS department) - First order on Sep 20, 2010 1. N Male Connector x 3 EA via [[http://www.mouser.com/ProductDetail/Amphenol-Connex/172100/?qs=sGAEpiMZZMtqi3rrGzC6kqBNVAfbUIcAs7pmvc7FO2w=]] 1. Lightning Arrestor N-Female N-Female x 1 EA via [[http://www.streakwave.com/Itemdesc.asp?ic=SP3-90-6-BFF&eq=&Tp=]] 1. BNC-J Connector x 1 EA via [[http://www.mouser.com/ProductDetail/Amphenol-Connex/112348/?qs=sGAEpiMZZMtqi3rrGzC6kltfvaDq2xsFsjWEfeOv%2fog=]] 1. Weatherproof Box x 1 EA via [[http://www.streakwave.com/Itemdesc.asp?ic=DCE-H-7x6x2&eq=&Tp=]] 1. Barrier Terminal Block x 2 EA via [[http://www.mouser.com/ProductDetail/Tyco-Electronics-AMP/1546306-4/?qs=sGAEpiMZZMvXvCN7QvKasSL6eMCRZuY6zjs15Djvrtg=]] 1. Lightning Surge x4 via [[http://www.mouser.com/ProductDetail/Littelfuse/SL1411A075A/?qs=ek3FaJ1hxEWg6rFszW4eAw==]] - Second order on Oct 6, 2010 1. Coaxial Cable 20AWG RG-58/U COAX 500' SPOOL BLACK via [[http://www.mouser.com/ProductDetail/Alpha-Wire/9058C-BK002/?qs=sGAEpiMZZMuwsoYAVCu3COxrc1%2ft2NbJpirN7iGs1GY=]] 1. Hinged DCE via [[http://www.streakwave.com/Itemdesc.asp?ic=DCE-H-7x6x2&eq=&Tp=]] 1. 12/3 SJTOW Black 105 CEE, 300 feet, via [[http://www.americord.com/bulk-cable-62-prod-541.html]] 1. Visiting WINLAB, Rutgers University on Oct 8, 2010 - Obtained the rest of the equipments: 1. WiMAX indoor unit (IDU) x 1 EA 1. ASN-GW Server x 1 EA 1. IDU/ODU power supplies x 2 EA 1. AWB US210 USB clients x 10 EA 1. Intel Link 6250 mini PCI module x 2 EA 1. Project request to the Facilities on Oct 9, 2010 - via [[http://facilities.columbia.edu/project-request]] 1. Space Unit measurement on Oct 13, 2010 @ Fairchild building - See attachment:diagram.pdf. 1. Complete setting of client testbed platform on Oct 29, 2010 - See [wiki:WIMXCOLUM/CUWIMAX/NicInstall "NIC installation"]. 1. Meeting with Facilities on Nov 29, 2010 - At CS office: an additional committe (real-estate) admission required. 1. Site survery for a new outdoor site (indoor site as well) on 09, 2010 - At Fairchild and Mudd building: Site change is necessary. 1. Meeting with electrician for the antenna mount on Dec 16, 2010 - At Mudd 14fl and IRT == 4. Campus WiMAX radio coverage map (expected) == || a. 2D map view (by Google map) || b. Aerial view (by Bing map) || || [[ThumbImage(coverage_map.png)]] || [[ThumbImage(coverage_aerial.jpg, thumb=450)]] || == 5. Conceptual diagram for deployment == [[Image(deployment_columbia_univ.pdf, 70%)]] [[Image(diagram.pdf, 50%)]] == 6. Site survey == Becuase of the various reaons, on Dec. 16 2010, we decide to change the outdoor and indoor sites to the southwest corner of Mudd building, 14 fl, rooftop. === New outdoor site at Mudd 14th floor === || a. Wide view || b. front view || c. SW corner || d. side view || e. detail || || [[ThumbImage(site1.JPG, thumb=200)]] || [[ThumbImage(wall3.jpg, thumb=200)]] || [[ThumbImage(wall4.jpg, thumb=200)]] || [[ThumbImage(wall1.jpg, thumb=200)]] || [[ThumbImage(wall2.jpg, thumb=200)]] || [[br]] || line-of-sight view 1 || LOS view 2 || || [[ThumbImage(los1.jpg, thumb=350)]] || [[ThumbImage(los2.jpg, thumb=350)]] || === New Indoor site at Mudd 14th floor (neer outdoor site, same level) === || [[ThumbImage(rack_space.jpg, thumb=200)]] || - Need to check the space availabilitye: 5U + pwr suplies. See [wiki:WIMXCOLUM/CUWIMAX/OldSites "Old outdoor/indoor sites"]. == 7. Indoor installment == === Notes === * It is strongly required connecting with `serial cable' between IDU and ASN-GW server because of monitoring purpose. == 8. Client Setting == - Platform: Dell Latitude D830 (IRT0045) - NIC: Intel Centrino Advanced-N WiMAX 6250 - Mini-PCI express with half size slot (Note: It fails booting on Thinkpad laptops because of their BIOS allows authorized interfaces only. See [http://www.thinkwiki.org/wiki/Problem_with_unauthorized_MiniPCI_network_card] for more details.) - OS: Ubuntu 10.10 Maverick with patched linux kernel 2.7.36-rc3 === NIC installation === See [wiki:WIMXCOLUM/CUWIMAX/NicInstall "network interface card installation"] for more detail. === Software installation === - Required software (from http://linuxwimax.org) 1. NIC firmware: i2400m-fw-1.5.0 1. Driver:compiled and built by patched linux kernel 1. WiMAX tool: wimax-tools-1.4.4 1. Open source supplicant: wpa_supplicant-0.7.2 with patch to build libeap.so library 1. WiMAX network service: wimax-1.5.1, Intel's WiMAX daemon ---- Last updated on [[Timestamp]]