Changes between Version 5 and Version 6 of WIMXBBN
- Timestamp:
- 02/05/10 16:19:47 (14 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
WIMXBBN
v5 v6 47 47 48 48 49 Step 1) Identify Outdoor Site on Campus: Completed 1/10 TM [[BR]]49 Step 1) Identify Outdoor Site on Campus: Completed 1/10; roof of BBN building at 10 Moulton, Cambridge; near other antennas; brackets on building to mount pole for antenna and pole; thick ground wire available; conduit for entry through roof available, used for other antenna cables; can drop fiber and -48VDC power cables through conduit, down to 5th floor, and over to testbed, estimate 150ft +-. TM [[BR]] 50 50 51 51 Step 2) Obtain FCC License: A) Applied 10MHz overlapping Sprint; started 12/09; pending; B) Applied 5MHz between Northeastern bands; started 1/10; pending; both) Received call sign (Wxxxx) on 1/10 TM [[BR]]