  • WIMXBBN

    v9 v10  
    4747
    4848
    49 Step 1)  Identify Outdoor Site on Campus:    Completed 1/10 TM;  roof of BBN Technologies building at 10 Moulton, Cambridge;  near other antennas;  brackets on building to mount pole for antenna and pole;  thick ground wire available and in use for other antennas;  conduit for entry through roof available, in use for other antenna cables;  can drop fiber and -48VDC power cables through conduit, down to 5th floor, and over to testbed, estimated 150ft+.   [[BR]]
    50 
    51 Step 2)  Obtain FCC License:  A)  Applied 10MHz overlapping Sprint;  started 12/09 TM;  pending;  B) Applied 5MHz between Northeastern bands; started 1/10 TM;  pending;  both)  Received call sign (Wxxxx) on 1/10  TM   [[BR]]
    52 
    53 Step 3)  Identify Indoor Equipment Room on Campus:  Completed 7/09  CG;  room 6/523 at 10 Moulton. [[BR]]
    54 
    55 Step 4)  Install Wiring at Outdoor Site and to Indoor Equipment Room:  planned/started/completed x/x/10 [[BR]]
    56 
    57 Step 5)  Install Pole at Outdoor Site and Ground:  planned/started/completed x/x/10 [[BR]]
    58 
    59 Step 6)  Install Antenna at Outdoor Site:  planned/started/completed x/x/10 [[BR]]
    60 
    61 Step 7)  Install Base Station Outdoor Unit:  planned/started/completed x/x/10 [[BR]]
    62 
    63 Step 8)  Complete Wiring at Outdoor Site and to Indoor Equipment Room:  planned/started/completed x/x/10 [[BR]]
    64 
    65 Step 9)  Install Indoor Equipment Racks and Ground:  planned/started/completed x/x/10 [[BR]]
    66 
    67 Step 10)  Install 120VAC and -48VDC Power Feeds and/or Supplies:  planned/started/completed x/x/10 [[BR]]
    68 
    69 Step 11)  Install Base Station Indoor Unit:  planned/started/completed x/x/10 [[BR]]
    70 
    71 Step 12)  Complete Wiring of Base Station Indoor Unit:  planned/started/completed x/x/10 [[BR]]
    72 
    73 Step 13)  Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units:  planned/started/completed x/x/10 [[BR]]
    74 
    75 Step 14)  Install Ethernet (VLAN) Switch, or Identify Existing Capacity:  planned/started/completed x/x/10 [[BR]]
    76 
    77 Step 15)  Install Linux Server(s) and Software:  planned/started/completed x/x/10 [[BR]]
    78 
    79 Step 16)  Connect Backbone Network:  planned/started/completed x/x/10 [[BR]]
    80 
    81 Step 17)  Provide Reference Client Platform:  planned/started/completed x/x/10 [[BR]]
    82 
    83 Step 18)  Inital Check-Out of Campus WiMAX Testbed:  planned/started/completed x/x/10 [[BR]]
     49|| Step || Description || Planned || Started || Completed || Comment ||
     50||   1  || Identify Outdoor Site on Campus || 1/10 || 1/10  || 1/10 || roof of BBN Technologies building at 10 Moulton, Cambridge;  near other antennas;  brackets on building to mount pole for antenna and pole;  thick ground wire available and in use for other antennas;  conduit for entry through roof available, in use for other antenna cables;  can drop fiber and -48VDC power cables through conduit, down to 5th floor, and over to testbed, estimated 150ft+. ||
     51|| 2a || Obtain FCC License || 12/09 || 12/09 || - || Applied for 10MHz overlapping Sprint ||
     52|| 2b || Obtain FCC License || 1/10 || 1/10 || - || Applied for 5MHz between Northeastern bands ||
     53|| 3 || Identify Indoor Equipment Room on Campus || 7/09 || 7/09 || 7/09 || CG;  room 6/523 at 10 Moulton.||
     54|| 4 || Install Wiring at Outdoor Site and to Indoor Equipment Room || - || - || - || ||
     55|| 5 || Install Pole at Outdoor Site and Ground  || - || - || - || ||
     56|| 6 || Install Antenna at Outdoor Site  || - || - || - || ||
     57|| 7 || Install Base Station Outdoor Unit  || - || - || - || ||
     58|| 8 || Complete Wiring at Outdoor Site and to Indoor Equipment Room  || - || - || - || ||
     59|| 9 || Install Indoor Equipment Racks and Ground  || - || - || - || ||
     60|| 10 || Install 120VAC and -48VDC Power Feeds and/or Supplies  || - || - || - || ||
     61|| 11 || Install Base Station Indoor Unit  || - || - || - || ||
     62|| 12 || Complete Wiring of Base Station Indoor Unit  || - || - || - || ||
     63|| 13 || Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units  || - || - || - || ||
     64|| 14 || Install Ethernet (VLAN) Switch, or Identify Existing Capacity  || - || - || - || ||
     65|| 15 || Install Linux Server(s) and Software || - || - || - || ||
     66|| 16 || Connect Backbone Network  || - || - || - || ||
     67|| 17 || Provide Reference Client Platform  || - || - || - || ||
     68|| 18 || Initial Check-Out of Campus WiMAX Testbed  || - || - || - || ||
    8469
    8570== Project Technical Documents ==