Changes between Version 73 and Version 74 of ViSE
- Timestamp:
- 10/26/09 16:22:04 (15 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
ViSE
v73 v74 11 11 12 12 13 == Technical Contacts==13 === Technical Contacts === 14 14 15 15 Principal Investigator: … … 42 42 ViSE team is pictured from left to right: Navin Sharma (graduate student), Prashant Shenoy (PI), David Irwin (Research Scientist), and Michael Zink (Co-PI). Deepak Ganesan and Jim Kurose (both Co-PIs) are not pictured. 43 43 44 == Participating Projects and Organizations==44 === Participating Organizations === 45 45 46 46 [http://vise.cs.umass.edu/trac/ ViSE web site][[BR]] … … 49 49 50 50 51 === GPO Liason System Engineer === 52 53 Harry Mussman hmussman@geni.net 54 55 51 56 == Scope == 52 57 53 58 The scope of work on this project is to extend your outdoor, wide-area sensor/actuator network testbed to support slivering and utilize a GENI candidate control framework (ORCA/Shirako), and then bring it into an environment of GENI federated testbeds. This includes: 1) Virtualization of your sensor/actuator system. 2) Integration with GENI-compliant Software Artifacts, including the use of Shirako software (part of the ORCA project) as the base for the control framework. 3) Making your testbed publicly available to GENI users, starting in year 1, and integrate it into an environment of GENI federated testbeds by the end of year 2. 4) Providing documentation for testbed users, administrators, and developers. 54 59 55 == Current Capabilities==60 === Current Capabilities === 56 61 57 62 During Spiral 1, we completed deployment of these sensor nodes: … … 130 135 131 136 132 == Milestones==137 === Milestones === 133 138 134 139 [[MilestoneDate(ViSE: 1a Assembly of three x86 sensor nodes)]] … … 181 186 [http://groups.geni.net/geni/attachment/wiki/ViSE/multisense.pdf "MultiSense: Fine-grained Multiplexing for Steerable Sensor Networks"][[BR]] 182 187 183 == Quarterly Status Reports==188 === Quarterly Status Reports === 184 189 185 190 [http://groups.geni.net/geni/attachment/wiki/ViSE/ViSE%20project%20QSR.pdf "ViSE: 4Q08 Status Report"][[BR]] … … 190 195 191 196 192 == Spiral 1 Connectivity==197 === Spiral 1 Connectivity === 193 198 194 199 Location of equipment: For Spiral 1, work will be done in a lab at UMassAmherst and at three field locations in Massachusetts. … … 216 221 In the coming year, we have committed to planning with our peers in Cluster D and the GPO on how to best use this new capability. As part of this plan, and before we can send/receive traffic on this link, we will discuss the roles and capabilities of Internet2 in forwarding our traffic to its correct destination. [[BR]] 217 222 218 == GPO Liason System Engineer == 219 220 Harry Mussman hmussman@geni.net 221 223 224 === Related Projects === 225 226 [http://groups.geni.net/geni/wiki/ViSE ViSE project][[BR]] 227 [http://prisms.cs.umass.edu/dome/ Diverse Outdoor Mobile Environment (DOME) project ][[BR]]