Changes between Version 10 and Version 11 of ViSE


Ignore:
Timestamp:
01/14/09 14:34:07 (15 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • ViSE

    v10 v11  
    7171[http://groups.geni.net/geni/attachment/wiki/ViSE/otg_node.jpg  Photo of OTG Node ][[BR]]
    7272[http://groups.geni.net/geni/attachment/wiki/ViSE/pastedGraphic.tiff  Photo of Node Deployment on Fire Tower ][[BR]]
    73 [http://groups.geni.net/geni/attachment/wiki/ViSE/vise-catalog.pdf  "ViSE Substrate Catalog" ] [[BR]]
     73[http://groups.geni.net/geni/attachment/wiki/ViSE/vise-catalog.pdf  "ViSE Substrate Description" ] [[BR]]
    7474
    7575'''Quarterly Status Reports'''
     
    8181Location of equipment:  For Spiral 1, work will be done in a lab at UMassAmherst and at three field locations in Massachusetts.
    8282
    83 Equipment information is found at [http://groups.geni.net/geni/attachment/wiki/ViSE/vise-catalog.pdf  "ViSE Substrate Catalog" ]
     83Equipment information is found at [http://groups.geni.net/geni/attachment/wiki/ViSE/vise-catalog.pdf  "ViSE Substrate Description" ]
    8484
    8585Layer 3 Connectivity:  IP access will be through UMass Amherst's campus network, using their public IP addresses.