== Project Number == 1861 == Project Title == University of Utah, Utah Education Network [[BR]] a.k.a. UEN, UTAHREGIONAL === Technical Contacts === '''PI''': Steven Corbato, University of Utah, steve.corbato@utah.edu [[BR]] Joe Breen, University of Utah, joe.breen@utah.edu === Participating Organizations === University of Utah [[BR]] Utah Education Network [[BR]] === GPO Liaison System Engineer === '''GPO System Engineer:''' [mailto:hdempsey@bbn.com Heidi Dempsey] == Scope == This project will deploy an OpenFlow substrate in the Utah area to enable 10Gpbs GENI OpenFlow access at Utah’s three research universities and collaboration with GENI rack deployment projects that can support other Utah higher education and high-school environments. UEN GENI deployments will be fully compliant with GENI software standards for GENI aggregates, as published at GENI Engineering Conferences. The sites will use one or more GENI Aggregate Managers controlling access to the aggregate resources. The sites will also support GENI experimenter access. The sites will support shared GENI monitoring and operations procedures and interfaces for the meso-scale infrastructure as published at GENI Engineering Conferences. === Current Capabilities === Please post descriptions of resources/functions/tools that are available to anyone in the GENI community == Milestones == || '''Milestone''' || '''Status''' || '''Begin Date''' || '''End Date''' || '''Notes''' || || Acquire and test HP aggregate switch for ProtoGENI and first GENI rack || Complete || April 2012 || June 15, 2012 || First rack is Rob's InstaGENI rack || || Deploy aggregate switch and bring new connections to Univ of Utah and UEN || || June 15, 2012 || July 6, 2012 || Dependent on testing of InstaGENI rack because implementation involves interruption of current ProtoGENI infrastructure || || Support multi-campus demo that includes new resources from this deployment and existing meso-scale resources. (GEC July, 2012 || || July 8, 2012 || || || Integrate and test with other existing Internet2 and NLR OpenFlow meso-scale deployments and GENI racks. (August 30, 2012) || || || Aug 30, 2012 || || || Make Switch resources available to NSF experimenters || || || Sept 30, 2012 || || || Acquire and test HP switch and second GENI rack || || 2013 || 2013 || || || Connect UEN data center and second GENI rack to regional OpenFlow network || || 2013 || 2013 || || || Transition stable parts of network to operations and support experimenters || || 2013 || 2013 || || || Acquire 2 HP Procurve 6600 switches and supporting equipment || || 2014 || 2014 || || || Connect 2 additional GENI racks in UEN to regional OpenFlow network || || 2014 || 2014 || || || Transition to operations || || 2014 || 2014 || || == Spiral 4 == == Project Technical Documents == Links to wiki pages for the project's technical documents go here. List should include any document in the working groups, as well as other useful documents. Projects may have a full tree of wiki pages here. === Post-GEC Status Reports === Please use this status report template: QuarterlyStatusReportTemplate Add links to Post-GEC status reports here === Spiral 2 Connectivity === Links to wiki pages about details of infrastrcture that the project is using (if any). Examples include IP addresses, hostnames, URLs, DNS servers, local site network maps, VLANIDs (if permanent VLANs are used), pointers to public keys. GPO may do first drafts of any of these and have the PI correct them to bootstrap. May also include ticket links for pending or known connectivity issues. Many projects will have a full tree of wiki pages here. === Related Projects === [http://URL Project-Name] Includes non-GENI projects.