wiki:UTAHREGIONAL

Version 13 (modified by joe.breen@utah.edu, 12 years ago) (diff)

--

Project Number

1861

Project Title

University of Utah, Utah Education Network
a.k.a. UEN, UTAHREGIONAL

Technical Contacts

PI: Steven Corbato, University of Utah, steve.corbato@utah.edu
Joe Breen, University of Utah, joe.breen@utah.edu

Participating Organizations

University of Utah
Utah Education Network

GPO Liaison System Engineer

GPO System Engineer: Heidi Dempsey

Scope

This project will deploy an OpenFlow substrate in the Utah area to enable 10Gpbs GENI OpenFlow access at Utah’s three research universities and collaboration with GENI rack deployment projects that can support other Utah higher education and high-school environments. UEN GENI deployments will be fully compliant with GENI software standards for GENI aggregates, as published at GENI Engineering Conferences. The sites will use one or more GENI Aggregate Managers controlling access to the aggregate resources. The sites will also support GENI experimenter access. The sites will support shared GENI monitoring and operations procedures and interfaces for the meso-scale infrastructure as published at GENI Engineering Conferences.

Current Capabilities

Please post descriptions of resources/functions/tools that are available to anyone in the GENI community

Milestones

This table shows expected activities for the three years that the project is expected to be active.

Milestone Status Begin Date End Date Notes
Acquire and test HP aggregate switch for ProtoGENI and first GENI rack Complete April 2012 June 15, 2012 First rack is Rob's InstaGENI rack
Deploy aggregate switch and bring new connections to Univ of Utah and UEN June 15, 2012 July 6, 2012 Dependent on testing of InstaGENI rack because implementation involves interruption of current ProtoGENI infrastructure
Support multi-campus demo that includes new resources from this deployment and existing meso-scale resources. (GEC July, 2012) July 8, 2012
Integrate and test with other existing Internet2 and NLR OpenFlow meso-scale deployments and GENI racks. (August 30, 2012) Aug 30, 2012
Make Switch resources available to NSF experimenters Sept 30, 2012
Acquire and test HP switch and second GENI rack 2013 2013
Connect UEN data center and second GENI rack to regional OpenFlow network 2013 2013
Transition stable parts of network to operations and support experimenters 2013 2013
Acquire 2 HP Procurve 6600 switches and supporting equipment 2014 2014
Connect 2 additional GENI racks in UEN to regional OpenFlow network 2014 2014
Transition to operations 2014 2014

Spiral 4

Project Technical Documents

Links to wiki pages for the project's technical documents go here. List should include any document in the working groups, as well as other useful documents. Projects may have a full tree of wiki pages here.

Post-GEC Status Reports

Please use this status report template: QuarterlyStatusReportTemplate

Add links to Post-GEC status reports here

Spiral 2 Connectivity

Links to wiki pages about details of infrastrcture that the project is using (if any). Examples include IP addresses, hostnames, URLs, DNS servers, local site network maps, VLANIDs (if permanent VLANs are used), pointers to public keys. GPO may do first drafts of any of these and have the PI correct them to bootstrap. May also include ticket links for pending or known connectivity issues. Many projects will have a full tree of wiki pages here.

Related Projects

Project-Name Includes non-GENI projects.