Changes between Version 7 and Version 8 of Shadow


Ignore:
Timestamp:
03/14/10 15:54:26 (14 years ago)
Author:
jwilliams@bbn.com
Comment:

added links to created S2 milestones

Legend:

Unmodified
Added
Removed
Modified
  • Shadow

    v7 v8  
    2525=== GPO Liaison System Engineer ===
    2626
     27Heidi Dempsey hdempsey@bbn.com
     28
    2729
    2830== Scope ==
     
    3638=== Milestones ===
    3739
    38 Links to wiki milestone entries go here.  Use Milestone macro:
    39 
    40 Purchase four Juniper M7i routers and install three of them ProtoGENI sites on Internet 2[[BR]]
    41 Develop standalone control software to virtualize the Juniper platform[[BR]]
    42 Develop a plan to incorporate the virtualized Juniper routers into ProtoGENI [[BR]]
    43 Develop and demonstrate software tools to collect measurement data from virtual Juniper routers[[BR]]
    44 Become familiar with the perfSONAR data models and representation.[[BR]]
    45 
     40[[MilestoneDate(Shadow: S2.a Purchase four Juniper M7i routers and install three of them ProtoGENI sites on Internet 2)]][[BR]]
     41[[MilestoneDate(Shadow: S2.b Develop standalone control software to virtualize the Juniper platform)]][[BR]]
     42[[MilestoneDate(Shadow: S2.c Develop a plan to incorporate the virtualized Juniper routers into ProtoGENI)]][[BR]]
     43[[MilestoneDate(Shadow: S2.d Develop and demonstrate software tools to collect measurement data from virtual Juniper routers)]][[BR]]
     44[[MilestoneDate(Shadow: S2.e Become familiar with the perfSONAR data models and representation)]][[BR]]
    4645
    4746== Project Technical Documents ==