Changes between Version 3 and Version 4 of ProjTemp-Post-GEC9-status


Ignore:
Timestamp:
11/19/10 21:04:06 (13 years ago)
Author:
Don Kline
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • ProjTemp-Post-GEC9-status

    v3 v4  
    2121=== B. Deliverables made ===
    2222
    23 A description of the planned VMI demo for GEC8, including configuration, requirements and key points is at the following link. This document was available as of (June 24, 2010). http://groups.geni.net/geni/wiki/vmiGec8DemoDescription
     23(07/21/10) VMI-FED: S2.c GEC8 demo - Demonstration at GEC8 showing VMI running on cluster nodes in a lab environment at the University of Alaska (UA).
     24
     25(09/01/10) VMI-FED: S2.e GENI VMI demo - Demonstration of initial VMI functionality on GENI cluster nodes.
     26
     27(11/04/10) VMI-FED: S2.f scale up demo - Demonstration at GEC8 showing VMI running on multiple ORCA cluster nodes.
     28
     29(07/15/10) VMI-FED: S2.d resource doc – Documentation of the new and diverse resources that could be federated into GENI which are available at the University of Alaska.
     30
     31(09/30/10) VMI-FED: S2.g analysis doc – Documentation of our findings and approach to federating new and diverse resources uniformly and on a large scale.
    2432
    2533== II. Description of work performed during last quarter ==