[[PageOutline]] = GENI Plastic Slices = The GENI Plastic Slices Project has a goal to advance meso-scale experiments to operate with production-quality GENI resources, while gaining experience in managing such an environment. The Plastic Slices project sets shared campus goals within an agreed upon schedule(by GEC12). This project plans to run ten (or more) GENI slices continuously for multiple months. = Project Plan = The Plastic Slices Project plan for running and managing simultaneous slices is captured in the [wiki:PlasticSlices/ProjectPlan Plastic Slices Project Plan] document. = Requirements tracking = The [wiki:PlasticSlices/ProjectPlan#a2.1.Experimenterrequirements Experimenters Requirements] detailed in the project plan are tracked in the Plastic Slices effort in the [wiki:PlasticSlices/RequirementsTracking Requirements Tracking] page. = Baseline Evaluation Plan = Details for each baseline evaluation are captured in the [wiki:PlasticSlices/BaselineEvaluation Baseline Evaluation Plan]. The Baselines Evaluations are designed to capture progress throughout the Plastic Slices project. Each baseline captures environment, evaluation details, evaluation criteria and a baseline report. = Environment = Capturing the definition of the environment used to validate the baselines scenarios is a crucial part of this activity. A complete definition will be captured to facilitate the repeatability of the baseline scenario in the Quality Assurance step to be performed by Georgia Tech. As part of the effort, the following will be captured: * [wiki:PlasticSlices/SliceStatus Slice Status] - A mapping of slices, experiments, and sites. * [wiki:PlasticSlices/SliceSnapshots Slice Snapshots] - A slice-centric record of the experiment environment will be captured at each baseline. * [wiki:PlasticSlices/SiteDiagrams Site Diagrams] - A site-centric capture the topology used at each site. * [wiki:PlasticSlices/ExperimentTopology Experiment Topology] - A slice-centric capture each experiment topology. As this project evolves, the GPO will generate recommendations for contributors managing campus sites for [wiki:PlasticSlices/MonitoringRecommendations Monitoring], [wiki:MyPlc/NetworkCoreRecommendations MyPLC], and [wiki:PlasticSlices/OFRecommendations OpenFlow] configuration recommendations. The GPO will also define [wiki:PlasticSlices/ExperimenterRecommendations Experimenters recommendations] and provide examples for potential types of experiments. = Project Status = Each baseline effort will capture a snapshot of each slice environment and provide [wiki:PlasticSlices/BaselineStatus status] at completion that captures baseline results. This table provides the "environment" (Slice Snapshots), the "plan" (Baseline Evaluation Details), the "results" (Baseline Evaluation Status) for each baseline, and any "outages" encountered during the baselines in the Plastic Slices project: || || '''Environment'''|| ''' Plan''' || '''Results and Analysis'''|| '''Outages''' || || || || '''Baseline1'''|| [wiki:PlasticSlices/SliceSnapshots#Baseline1 Slices Snapshot]|| [wiki:PlasticSlices/BaselineEvaluation#Baseline1 Evaluation Summary] || [wiki:PlasticSlices/BaselineEvaluation/Baseline1Details Evaluation Results] || [wiki:PlasticSlices/Outages Outages] || || || || '''Baseline2'''|| [wiki:PlasticSlices/SliceSnapshots#Baseline2 Slices Snapshot]|| [wiki:PlasticSlices/BaselineEvaluation#Baseline2 Evaluation Summary] || [wiki:PlasticSlices/BaselineEvaluation/Baseline2Details Evaluation Results] || [wiki:PlasticSlices/Outages Outages] || || || || '''Baseline3'''|| [wiki:PlasticSlices/SliceSnapshots#Baseline3 Slices Snapshot]|| [wiki:PlasticSlices/BaselineEvaluation#Baseline3 Evaluation Summary] || [wiki:PlasticSlices/BaselineEvaluation/Baseline3Details Evaluation Results] || [wiki:PlasticSlices/Outages Outages] || || || || '''Baseline4'''|| [wiki:PlasticSlices/SliceSnapshots#Baseline4 Slices Snapshot]|| [wiki:PlasticSlices/BaselineEvaluation#Baseline4 Evaluation Summary] || [wiki:PlasticSlices/BaselineEvaluation/Baseline4Details Evaluation Results] || [wiki:PlasticSlices/Outages Outages] || || || || '''Baseline5'''|| [wiki:PlasticSlices/SliceSnapshots#Baseline5 Slices Snapshot]|| [wiki:PlasticSlices/BaselineEvaluation#Baseline5 Evaluation Summary] || [wiki:PlasticSlices/BaselineEvaluation/Baseline5Details Evaluation Results] || [wiki:PlasticSlices/Outages Outages] || || || '''Baseline6'''|| [wiki:PlasticSlices/SliceSnapshots#Baseline6 Slices Snapshot]|| [wiki:PlasticSlices/BaselineEvaluation#Baseline6 Evaluation Summary] || [wiki:PlasticSlices/BaselineEvaluation/Baseline6Details Evaluation Results] || [wiki:PlasticSlices/Outages Outages] || || || || '''Baseline7'''|| [wiki:PlasticSlices/SliceSnapshots#Baseline7 Slices Snapshot]|| [wiki:PlasticSlices/BaselineEvaluation#Baseline7 Evaluation Summary] || [wiki:PlasticSlices/BaselineEvaluation/Baseline7Details Evaluation Results] || [wiki:PlasticSlices/Outages Outages] || || || || '''Baseline8'''|| [wiki:PlasticSlices/SliceSnapshots#Baseline8 Slices Snapshot]|| [wiki:PlasticSlices/BaselineEvaluation#Baseline8 Evaluation Summary] || [wiki:PlasticSlices/BaselineEvaluation/Baseline8Details Evaluation Results] || [wiki:PlasticSlices/Outages Outages] || [[BR]] Detailed status for major areas of the Plastic Slices project can be found in the following pages: ||[wiki:PlasticSlices/MonitoringStatus Monitoring Status]|| Monitoring status and recommendations || || || ||[wiki:PlasticSlices/MyplcStatus MyPLC Status]|| MyPLC configuration status and recommendations || || || || [wiki:PlasticSlices/OFStatus OF Status] || OF configuration status and recommendations || = Reports = While periodic updates are to be generated for each baseline to capture [wiki:PlasticSlices/BaselineStatus status] progress against the planned activities, there are also three interim reports planned to be posted to the egeni-trials@lists.stanford.edu mail list and to [wiki:PlasticSlices/Reports Plastic Slices Reports] page. The interim reports to be published will be at the following dates: || '''Interim Report''' || '''Related Activities''' || || || ||[wiki:PlasticSlices/Reports#Interimreport2011-05-09 2011-05-09 ] || Report before Baseline 1, when BBN finalizes the initial slice configuration (all eight campuses, running ten artificial experiments). || ||[wiki:PlasticSlices/Reports#Interimreport2011-06-06 2011-06-06 ] || At the completion of baseline 4, after BBN replaces some artificial experiments with real experiments, and revises the slice/campus/experiment configuration as needed.|| ||[wiki:PlasticSlices/Reports#Interimreport2011-06-27 2011-06-27 ] || At the completion of baseline 8, after BBN replaces more artificial experiments with real experiments, and revises the slice/campus/experiment configuration as needed. || Additionally a final report will be presented at GEC11 which will also be available in the [wiki:PlasticSlices/FinalReport Final Evaluation Report] page. = Quality Assurance = Any documents, procedures or guidelines that we generate as part of the hand-off to Georgia Tech for the Quality Assurance phase of this project will be captured here. ----