wiki:PlasticSlices/SliceStatus

Version 16 (modified by lnevers@bbn.com, 14 years ago) (diff)

--

Slice Status

This page tracks the current mapping of slices, experiments, and sites. The goal of this page is to provide a high level view of participants and experiments, over the course of the Plastic Slices project. If you are interested in a detailed snapshot, please refer to the Slice Snapshots page. Note that BBN has resources in every slice purely to make it easier for us to debug basic "is this slice working at all" type problems.

Baseline 3 and 4

The following table provides an outline of participants for Baseline 3 and 4. The Rutgers and Georgia Tech sites were brought up and participated starting in Baseline 3.

Slice VLAN BBN CLEM GT IU RUTG STAN WASH WISC Notes Experiment
plastic-101 3715 BBN CLEM GT IU RUTG STAN WASH WISC All sites on 3715. GigaPing
plastic-102 3716 BBN CLEM GT IU RUTG STAN WASH WISC All sites on 3716. GigaPing
plastic-103 3715 BBN RUTG STAN WASH Endpoints of 3715. GigaPerf TCP
plastic-104 3716 BBN CLEM RUTG Endpoints of 3716. GigaPerf UDP
plastic-105 3715 BBN CLEM GT WISC Campuses that share a FrameNet switch. GigaPerf TCP
plastic-106 3716 BBN CLEM GT WISC Campuses that share a FrameNet switch. GigaPerf UDP
plastic-107 3715 BBN CLEM GT IU WASH Five of the eight sites. GigaWeb
plastic-108 3716 BBN IU RUTG STAN WISC Five of the eight sites. GigaWeb
plastic-109 3715 BBN CLEM IU STAN WASH WISC Six of the eight sites. GigaNetcat
plastic-110 3716 BBN GT IU RUTG STAN WASH Six of the eight sites. GigaNetcat

For information about the planned evaluation refer to the Baseline3 and Baseline4 sections of the Baseline Evaluation Plan. For Results and Analysis refer to the Baseline3 and Baseline4 pages.


Baseline 1 and 2

The following table provides an outline of participants for Baseline 1 and 2.

Slice VLAN BBN CLEM GT IU RUTG STAN WASH WISC Notes Experiment
plastic-101 3715 BBN CLEM IU STAN WASH WISC All sites on 3715. GigaPing
plastic-102 3716 BBN CLEM IU STAN WASH WISC All sites on 3716. GigaPing
plastic-103 3715 BBN STAN WASH Endpoints of 3715. GigaPerf TCP
plastic-104 3716 BBN CLEM Endpoints of 3716. GigaPerf UDP
plastic-105 3715 BBN CLEM WISC Campuses that share a FrameNet switch. GigaPerf TCP
plastic-106 3716 BBN CLEM WISC Campuses that share a FrameNet switch. GigaPerf UDP
plastic-107 3715 BBN CLEM IU WASH Five of the eight sites. GigaWeb
plastic-108 3716 BBN IU STAN WISC Five of the eight sites. GigaWeb
plastic-109 3715 BBN CLEM IU STAN WASH WISC Six of the eight sites. GigaNetcat
plastic-110 3716 BBN IU STAN WASH Six of the eight sites. GigaNetcat

For information about the planned evaluation refer to the Baseline1 and Baseline2 sections of the Baseline Evaluation Plan. For Results and Analysis refer to the Baseline1 and Baseline2 pages.