Changes between Version 3 and Version 4 of PlasticSlices/Reports


Ignore:
Timestamp:
05/09/11 23:24:54 (13 years ago)
Author:
Josh Smift
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • PlasticSlices/Reports

    v3 v4  
    55= Interim report : 2011-05-09 =
    66
    7 The project is off to a good start, especially given the aggressive schedule for ramping up from scattered pieces to a full integrated mesoscale GENI infrastructure. Five campuses are now online and ready to go, along with the two backbone providers, and the three other campuses are close. We've begun creating some slices, although we've been slowed by some obstacles surrounding the complexity of one person running ten slices with ten separate OpenFlow controllers, etc. Monitoring data is starting to flow into the GMOC, and we're on track to complete the first baseline by next Monday.
     7The project is off to a good start, especially given the aggressive schedule for ramping up from scattered pieces to a full integrated mesoscale GENI infrastructure. Five campuses are now online and ready to go, along with the two backbone providers, and the three other campuses are close. We've begun creating some slices, although we've been slowed by some obstacles surrounding the complexity of one person running ten slices with ten separate OpenFlow controllers, etc. Monitoring data is starting to flow into the GMOC, with more campuses coming online this week, and we're on track to complete the first baseline by next Monday.
    88
    99Links of interest: