Changes between Version 2 and Version 3 of PlasticSlices/Continuation/Standing006
- Timestamp:
- 09/12/13 13:48:36 (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
PlasticSlices/Continuation/Standing006
v2 v3 3 3 = Standing Run 006 = 4 4 5 This is the sixth of a series of standing runs, of indefinite length, for as long as the composition of the slices remained consistent. We're thus no longer writing up results or comments on this page; we expect to create some visualization tools for the raw log data, but haven't yet. (Or switch to using some real I&M tools, at some point.)5 This was the sixth of a series of standing runs, of indefinite length, for as long as the composition of the slices remained consistent. We're thus no longer writing up results or comments on this page; we expect to create some visualization tools for the raw log data, but haven't yet. (Or switch to using some real I&M tools, at some point.) 6 6 7 7 In this run, we dropped the ExoGENI racks while they were down for scheduled maintenance, and added the new Clemson IG rack. … … 12 12 13 13 * 00ssh_config_1 for the aliases from before Sep 4th 14 * 00ssh_config_2 for the aliases between Sep 4th - present15 16 This run use sZoing to manage the experiments, which launches hour-long runs out of cron, logging each experiment to a separate file.17 18 The raw logs are at http://www.gpolab.bbn.com/plastic-slices/continuation/standing-00 5/, and run from 2013-08-30 through the present.14 * 00ssh_config_2 for the aliases between Sep 4th - Sep 12th 15 16 This run used Zoing to manage the experiments, which launches hour-long runs out of cron, logging each experiment to a separate file. 17 18 The raw logs are at http://www.gpolab.bbn.com/plastic-slices/continuation/standing-006/, and run from 2013-08-30 through 2013-09-12, although ps107 through ps110 were shut down a day earlier. 19 19 20 20 Everything below this point was automatically generated by the script that manages the other aspects of the slice configuration.