Changes between Initial Version and Version 1 of PlasticSlices/BaselineStatus


Ignore:
Timestamp:
04/27/11 10:16:47 (13 years ago)
Author:
lnevers@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • PlasticSlices/BaselineStatus

    v1 v1  
     1[[PageOutline]]
     2= Plastic Slices Status =
     3
     4Periodic status reports will be generated at the completion of each baseline during the Plastic Slices Project.  This page will capture all status and progress within specified area by baselines.  Additionally, planned interim and final reports are also captured in this page.
     5
     6------
     7== Baseline 1 Status ==
     8
     9''Question:  What major areas should be covered in each status?  ''
     10
     11Proposed:
     12   - Actual progress against planned baseline evaluation criteria
     13   - Baseline results (successful criteria and failed criteria)
     14   - Update on which requirements have been met in this milestone in progress towards the [http://groups.geni.net/syseng/wiki/PlasticSlices/RequirementsTracking Project goals]
     15   - Monitoring results and assessment
     16   - Tools and support updates
     17   - Issues by category (blocking, critical, major)
     18   - other
     19   
     20------
     21== Baseline 2 Status ==
     22
     23... same topics as previous
     24
     25------
     26== Baseline 3 Status ==
     27------
     28== Baseline 4 Status ==
     29------
     30== Baseline 5 Status ==
     31------
     32== Baseline 6 Status ==
     33------
     34== Baseline 7 Status ==
     35------
     36== Baseline 8 Status ==
     37
     38
     39