5 | | In this baseline, we intended to run multiple rounds of experiments simulating Emergency Stop requests at different campuses. We completed one round with the GMOC and agreed to test with other sites after making some improvements to procedures and documentation. We left the "round" structure (on this page and in the log directory) in place for simplicity. We'll run additional rounds after GEC 11 in the continuation phase of this project. |
6 | | |
7 | | We conducted two Emergency Stop tests: One in which the GMOC contacted the site admins about suspicious traffic from a slice (plastic-104 in this example) and asked them to cut it off; and one to simulate the situation in which the GMOC is unable to contact any site admins, and cuts off traffic in the core. We used BBN as the site for both tests, and uncovered a variety of procedural and documentation issues, which the GMOC is addressing. |
| 5 | In this baseline, we intended to run multiple rounds of experiments simulating Emergency Stop requests at different campuses. We completed one round with the GMOC and agreed to postpone the rest. We left the "round" structure (on this page and in the log directory) in place for simplicity. We'll run additional rounds after GEC 11 in the continuation phase of this project. |
| 6 | |
| 7 | We conducted two Emergency Stop tests: One in which the GMOC contacted the site admins about suspicious traffic from a slice (plastic-104 in this example) and asked them to cut it off; and one to simulate the situation in which the GMOC is unable to contact any site admins, and cuts off traffic in the core. We used BBN as the site for both tests, and uncovered a variety of procedural and documentation issues, which the GMOC and GPO are addressing. |