Version 8 (modified by 13 years ago) (diff) | ,
---|
Project Number
1780
Project Title
Experiment Workflow Tools and Services for GENI
a.k.a. PGTools
Technical Contacts
Principal Investigator John Regehr regehr@cs.utah.edu
Co-PI Robert Ricci ricci@cs.utah.edu
Participating Organizations
University of Utah, School of Computing
50 S. Central Campus Dr. Rm. 3190
Salt Lake City, UT 84112
GPO Liaison System Engineer
Vic Thomas vthomas@geni.net
Scope
This work will extend the University of Utah Emulab experiment lifecycle management software to become a “full service” front end for experiments on the ProtoGENI control framework and potentially for other frameworks based on the GENI control APIs.
Current Capabilities
Flack experimenter tool: http://www.protogeni.net/trac/protogeni/wiki/Flack
Flack manual: http://www.protogeni.net/trac/protogeni/wiki/FlackManual
Milestones
Spiral 4
- MilestoneDate(PGTools: S4.a Experimenter outreach)?
- MilestoneDate(PGTools: S4.b Experimenter outreach)?
- MilestoneDate(PGTools: S4.c Experimenter outreach)?
- MilestoneDate(PGTools: S4.d Software and documentation release)?
Project Technical Documents
http://www.protogeni.net/trac/protogeni/wiki/FlackManual
Quarterly Status Reports
2Q2010 Report
April 2011 Report
Spiral 2 Connectivity
Links to wiki pages about details of infrastrcture that the project is using (if any). Examples include IP addresses, hostnames, URLs, DNS servers, local site network maps, VLANIDs (if permanent VLANs are used), pointers to public keys. GPO may do first drafts of any of these and have the PI correct them to bootstrap. May also include ticket links for pending or known connectivity issues. Many projects will have a full tree of wiki pages here.
Related Projects
Includes non-GENI projects.
Attachments (1)
-
pgtools-review.pptx (315.3 KB) - added by 14 years ago.
Spiral 2 review presentation.
Download all attachments as: .zip