  • OpenFlow/Slicer/TestPlan

    v7 v8  
    105105 * Set the logging back to a standard level.  Leave the setup running overnight.  In the morning, verify that the logs have been rotated, and that logging is still working. ''(006-c)''
    106106
    107 Suggested 1 software development/support test case:
    108  - Make sure that there is a support mail-list, use list during testing, and make sure access to development/support is documented for users (OF-OPR-SLCR-SW-001, OF-OPR-SLCR-SW-002).
    109  - Verify existence of migration plan from OF 1.0 to OF 1.3. (OF-OPR-SLCR-SW-003)
    110  - Repository access validation (OF-OPR-SLCR-SW-004, OF-OPR-SLCR-SW-005, OF-OPR-SLCR-SW-006)
    111  - Software installation/installation and runtime (OF-OPR-SLCR-SW-007)
     107== OF-OPR-SLCR-SW Testing ==
     108 * Ensure there is a support mailing list and some level of documentation for users. ''(001)'' ''(002)''
     109 * Ensure with the development team that there is a plan to support OpenFlow 1.3 in the future. ''(003)''
     110 * Ensure that there is a repository which we can acccess. ''(004)''
     111 * Ensure that upgrades of software don't destroy previous configuration. ''(007)''
     112 * Work with the development team to make sure they can satisfy remaining software requirements. ''(005)'' ''(006)'' ''(008)''
    112113
    113  '' Note 3: Note sure how to track OF-OPR-SLCR-SW-008? ''
    114 
     114== Wishlist Testing ==
    115115Define test cases that capture supplementary test cases for the [wiki:OpenFlow/Slicer/Requirements#Wishlist Wishlist Functionality] that may be delivered.
    116116