wiki:OpenFlow/Slicer/TestPlan/Results/FlowspaceFirewall/1.0.5-dev-20150515

Version 6 (modified by tupty@bbn.com, 9 years ago) (diff)

--

OpenFlow Slicer Test Plan Results

This page tracks the results of a piece of software run through the OpenFlow Slicer Test Plan.

SoftwareVersion
Flowspace Firewall 1.0.5-dev branch snapshot (2015-05-15)

Results Legend

Individual test case status may be one of the following:

OF-OPR-SLCR-FN Testing

Results

Step 1: Setup

Test CaseResultNote
1.a.i. Color(green,Pass)?
1.a.ii. Color(green,Pass)?
1.a.iii. Color(green,Pass)?
1.a.iv. Color(green,Pass)?
1.a.v. Color(green,Pass)?
1.b. Color(green,Pass)?
1.c. Color(green,Pass)?

Step 2: Establish that basic connectivity works

Test CaseResultNote
2.a. Color(green,Pass)?
2.b. Color(green,Pass)?
2.c. Color(green,Pass)?
2.d. Color(green,Pass)?
2.e. Color(green,Pass)?
2.f.i. Color(green,Pass)?
2.f.ii. Color(green,Pass)?
2.f.iii. Color(green,Pass)?
2.f.iv. Color(green,Pass)?
2.f.v. Color(green,Pass)?
2.g. Color(green,Pass)?

Step 3: Test for VLAN enforcement and translation

Test CaseResultNote
3.a. Color(green,Pass)?
3.b. Color(green,Pass)?
3.c. Color(green,Pass)?
3.d. Color(green,Pass)?
3.e. Color(green,Pass)?

Step 4: Check data plane throughput

Test CaseResultNote
4.a. Color(green,Pass)?
4.b. Color(green,Pass)?
4.c. Color(green,Pass)?
4.d. Color(green,Pass)?
4.e. Color(green,Pass)?

Step 5: Test for OF functionality

Test CaseResultNote
5.a. Color(green,Pass)?
5.b. Color(green,Pass)?
5.c. Color(green,Pass)?
5.d.i. Color(green,Pass)?
5.d.ii. Color(red,Fail)? Issue 121 filed
5.d.iii. Was not run
5.e.i. Was not run
5.e.ii. Color(green,Pass)?

Test 6: Test for stacked slicer support

Test CaseResultNote
6.a. Color(green,Pass)?
6.b. Color(green,Pass)?

Test 7: Test for any extra functionality

Test CaseResultNote
7.a. Color(green,Pass)? Disregard test run in attached tarball.
7.b. Was not run
7.c. Color(green,Pass)? Disregard test run in attached tarball.

Test 8: Test management API

Test CaseResultNote
8.a. Color(orange,Blocked)? Waiting on implementation
8.b. Color(orange,Blocked)? Waiting on implementation
8.c. Color(orange,Blocked)? Waiting on implementation
8.d. Color(orange,Blocked)? Waiting on implementation

Logs

Fill these in as needed

OF-OPR-SLCR-OP Testing

Results

Step 1: Setup

Test CaseResultNote
1.a.
1.b.

Step 2: Collect monitoring data

Test CaseResultNote
2.a.

Step 3: Test slice operations

Test CaseResultNote
3.a.
3.b.
3.c.
3.d.
3.e.

Step 4: Substrate-generated traffic

Test CaseResultNote
4.a.
4.b.

Step 5: Test logging

Test CaseResultNote
5.a.
5.b.
5.c.
5.d.
5.e.

Logs

Fill these in as needed

OF-OPR-SLCR-SW Testing

Results

Step 1: Perform validation steps

Test CaseResultNote
1.a.
1.b.
1.c.
1.d.
1.e.

Logs

Fill these in as needed

Integration Testing

Results

Step 1: Setup

Test CaseResultNote
1.a.
1.b.
1.c.
1.d.

Step 2: Collect monitoring data

Test CaseResultNote
2.a.

Wishlist Testing

Results

Step 1: Check documentation

Test CaseResultNote
1.a.
1.b.
1.c.

Step 2: Set up the environment

Test CaseResultNote
2.a.
2.b.
2.c.

Step 3: Test that priority setting works

Test CaseResultNote
3.a.
3.b.
3.c.
3.d.

Logs

Fill these in as needed

Attachments (3)

Download all attachments as: .zip