    4242'''Milestones'''
    4343
    44 [milestone:"ORCABEN: 1a Extend ORCA as a GENI control framework"] 
    45 due 4/1/09
    46 [http://groups.geni.net/geni/ticket/96  "completed 3/31/09"]
     44[[MilestoneDate(ORCABEN: 1a Extend ORCA as a GENI control framework)]] 
     45[http://groups.geni.net/geni/ticket/96  status]
    4746[[BR]]
    48 [milestone:"ORCABEN: 1b Make an early reference implementation of ORCA available"] 
    49 due 4/1/09
    50 [http://groups.geni.net/geni/ticket/97  "completed 4/8/09"]
     47[[MilestoneDate(ORCABEN: 1b Make an early reference implementation of ORCA available)]] 
     48[http://groups.geni.net/geni/ticket/97  status]
    5149[[BR]]
    52 [milestone:"ORCABEN: 1c Integration of NDL or other topology description mechanism"] 
    53 due 6/1/09
    54 [http://groups.geni.net/geni/ticket/98  "started"]
     50[[MilestoneDate(ORCABEN: 1c Integration of NDL or other topology description mechanism)]] 
     51[http://groups.geni.net/geni/ticket/98  status]
    5552[[BR]]
    56 [milestone:"ORCABEN: 1d Integrate ORCA with BEN including slivering of Infinera DTNs"] 
    57 due 6/1/09
    58 [http://groups.geni.net/geni/ticket/99  "started"]
     53[[MilestoneDate(ORCABEN: 1d Integrate ORCA with BEN including slivering of Infinera DTNs)]] 
     54[http://groups.geni.net/geni/ticket/99  status]
    5955[[BR]]
    60 [milestone:"ORCABEN: 1e Complete end-to-end VLAN connections between BEN and NLR"] 
    61 due 6/1/09
    62 [http://groups.geni.net/geni/ticket/100  "started"]
     56[[MilestoneDate(ORCABEN: 1e Complete end-to-end VLAN connections between BEN and NLR)]]
     57[http://groups.geni.net/geni/ticket/100  status]
    6358[[BR]]
    64 [milestone:"ORCABEN: 1f All ORCA assigned prototypes integrated into ORCA clearinghouse"] 
    65 due 8/1/09
    66 [http://groups.geni.net/geni/ticket/101  "started"]
     59[[MilestoneDate(ORCABEN: 1f All ORCA assigned prototypes integrated into ORCA clearinghouse)]]
     60[http://groups.geni.net/geni/ticket/101  status]
    6761[[BR]]
    68 [milestone:"ORCABEN: 1g Make a working and tested prototype of BEN and GENI available for limited external research"] 
    69 due 10/1/09
     62[[MilestoneDate(ORCABEN: 1g Make a working and tested prototype of BEN and GENI available for limited external research)]] 
    7063[[BR]]
    71 [milestone:"ORCABEN: 1h Delivery of preliminary control framework design documentation"] 
    72 due 10/1/09
     64[[MilestoneDate(ORCABEN: 1h Delivery of preliminary control framework design documentation)]] 
    7365[[BR]]
    7466