Changes between Version 10 and Version 11 of ORCABEN


Ignore:
Timestamp:
12/12/08 18:11:00 (15 years ago)
Author:
hdempsey@bbn.com
Comment:

remove spaces from mielstone names

Legend:

Unmodified
Added
Removed
Modified
  • ORCABEN

    v10 v11  
    3838'''Milestones'''
    3939
    40 [milestone:"ORCABEN:  1a Extend ORCA as a GENI control framework"]  [[BR]]
    41 [milestone:"ORCABEN:  1b Make an early reference implementation of ORCA available"]  [[BR]]
    42 [milestone:"ORCABEN:  1c Integration of NDL or other topology description mechanism"]  [[BR]]
    43 [milestone:"ORCABEN:  1d Integrate ORCA with BEN including slivering of Infinera DTNs"]  [[BR]]
    44 [milestone:"ORCABEN:  1e Complete end-to-end VLAN connections between BEN and NLR"]  [[BR]]
    45 [milestone:"ORCABEN:  1f All ORCA assigned prototypes integrated into ORCA clearinghouse"]  [[BR]]
    46 [milestone:"ORCABEN:  1g Make a working and tested prototype of BEN and GENI available for limited external research"]  [[BR]]
    47 [milestone:"ORCABEN:  1h Delivery of preliminary control framework design documentation"]  [[BR]]
     40[milestone:"ORCABEN: 1a Extend ORCA as a GENI control framework"]  [[BR]]
     41[milestone:"ORCABEN: 1b Make an early reference implementation of ORCA available"]  [[BR]]
     42[milestone:"ORCABEN: 1c Integration of NDL or other topology description mechanism"]  [[BR]]
     43[milestone:"ORCABEN: 1d Integrate ORCA with BEN including slivering of Infinera DTNs"]  [[BR]]
     44[milestone:"ORCABEN: 1e Complete end-to-end VLAN connections between BEN and NLR"]  [[BR]]
     45[milestone:"ORCABEN: 1f All ORCA assigned prototypes integrated into ORCA clearinghouse"]  [[BR]]
     46[milestone:"ORCABEN: 1g Make a working and tested prototype of BEN and GENI available for limited external research"]  [[BR]]
     47[milestone:"ORCABEN: 1h Delivery of preliminary control framework design documentation"]  [[BR]]
    4848
    4949Trac website maintained by RENCI: