Changes between Version 1 and Version 2 of OKGems-1Q12-status


Ignore:
Timestamp:
08/12/12 22:04:41 (12 years ago)
Author:
andyli
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • OKGems-1Q12-status

    v1 v2  
    2020The following tasks are ongoing:
    2121 
    22   * Create a MagicLink prototype to integrate multi-site CPS testbeds
     22  * Create a !MagicLink prototype to integrate multi-site CPS testbeds
    2323  * Prepare experiments on ORCA ExoGENI
    2424
     
    3636
    3737=== C. Publications (individual and organizational) ===
    38   * G. Reyes*, D. Wang*, R. Nair*, C. Li, X. Li, J. Lin, "VitalTrack: A Doppler Radar Sensor Platform for Monitoring Activity Levels," the 2nd Annual IEEE Topical Conference on Biomedical Wireless Technologies, Networks, and Sensing Systems (BioWireleSS 2012).
     38  * G. Reyes*, D. Wang*, R. Nair*, C. Li, X. Li, J. Lin, "!VitalTrack: A Doppler Radar Sensor Platform for Monitoring Activity Levels," the 2nd Annual IEEE Topical Conference on Biomedical Wireless Technologies, Networks, and Sensing Systems (BioWireleSS 2012).
    3939
    4040=== D. Outreach activities ===