Version 4 (modified by 15 years ago) (diff) | ,
---|
Project Number
1716
Project Title
OKGems: A GENI-Federated Cyber-Physical System with Multi-Modalities
a.k.a. OKGEMS
Technical Contacts
PI: Xiaolin (Andy) Li,
Computer Science Department,
Oklahoma State University (OSU)
andyli
http://cs.okstate.edu/~xiaolin/
Co-PI: Venkatesh Sarangan
Computer Science Department,
Oklahoma State University (OSU)
saranga@cs.okstate.edu
http://www.cs.okstate.edu/~saranga/
Co-PI: Johnson Thomas,
Computer Science Department,
Oklahoma State University (OSU)
jpt@cs.okstate.edu
http://www.cs.okstate.edu/~jpt
Co-PI: Nazanin Rahnavard
School of Electrical and Computer Engineering,
Oklahoma State University (OSU)
nazanin.rahnavard@okstate.edu
http://cwnlab.ece.okstate.edu/
Co-PI: Weihua Sheng,
School of Electrical and Computer Engineering,
Oklahoma State University (OSU)
weihua.sheng@okstate.edu
http://wsheng.okstate.edu/
Participating Organizations
GPO Liason System Engineer
Harry Mussman hmussman@geni.net
Scope
This project will integrate sensor nodes, robotic platforms and PCs into the ORCA control framework (Cluster D), and make them available for use by GENI researchers.
The sensor networks will be deployed in a laboratory setting and in a farmland setting. The sensor nodes will include various kinds of motes, such as Tmote, MicaZ, Telosb, Jennic nodes, and Micadot, and high-end nodes, such as Stargates and Imote2.
The robotic platforms include Pioneer 3 DX/AT all-terrain autonomous robots, iRobot Create autonomous robots, and Surveyor robots with cameras and laser range finders.
A small cluster of PCs will be integrated for management of these heterogeneous resources.
Current Capabilities
Milestones
MilestoneDate(OKGEMS: S2.a Plan to integrate sensor nodes)?
MilestoneDate(OKGEMS: S2.b Cluster plan for VLANs between testbeds)?
MilestoneDate(OKGEMS: S2.c Integrate lab sensor nodes)?
MilestoneDate(OKGEMS: S2.d Integrate field sensor nodes)?
MilestoneDate(OKGEMS: S2.e Plan to integrate robotic nodes)?
MilestoneDate(OKGEMS: S2.f Move broker to clearinghouse)?
MilestoneDate(OKGEMS: S2.g Contribution to GENI outreach)?
Project Technical Documents
Quarterly Status Reports
Spiral 2 Connectivity
Related Projects
Attachments (1)
-
okgems10review.pptx (227.4 KB) - added by 14 years ago.
OKGems Year-End Review
Download all attachments as: .zip