Project Number

1716

Project Title

OKGems: A GENI-Federated Cyber-Physical System with Multi-Modalities
a.k.a. OKGEMS

Technical Contacts

PI: Xiaolin (Andy) Li, Computer Science Department, Oklahoma State University (OSU) andyli http://cs.okstate.edu/~xiaolin/
Co-PI: Venkatesh Sarangan Computer Science Department, Oklahoma State University (OSU) saranga@cs.okstate.edu http://www.cs.okstate.edu/~saranga/
Co-PI: Johnson Thomas, Computer Science Department, Oklahoma State University (OSU) jpt@cs.okstate.edu http://www.cs.okstate.edu/~jpt
Co-PI: Nazanin Rahnavard School of Electrical and Computer Engineering, Oklahoma State University (OSU) nazanin.rahnavard@okstate.edu http://cwnlab.ece.okstate.edu/
Co-PI: Weihua Sheng, School of Electrical and Computer Engineering, Oklahoma State University (OSU) weihua.sheng@okstate.edu http://wsheng.okstate.edu/

Participating Organizations

Department of Computer Science and School of Electrical and Computer Engineering
Oklahoma State University

GPO Liaison System Engineer

Harry Mussman hmussman@geni.net

Scope

This project will integrate sensor nodes, robotic platforms and PCs into the ORCA control framework (Cluster D), and make them available for use by GENI researchers.

The sensor networks will be deployed in a laboratory setting and in a farmland setting. The sensor nodes will include various kinds of motes, such as Tmote, MicaZ, Telosb, Jennic nodes, and Micadot, and high-end nodes, such as Stargates and Imote2. The robotic platforms include Pioneer 3 DX/AT all-terrain autonomous robots, iRobot Create autonomous robots, and Surveyor robots with cameras and laser range finders.

A small cluster of PCs will be integrated for management of these heterogeneous resources.

Current Capabilities

Milestones

MilestoneDate(OKGEMS: S2.a Plan to integrate sensor nodes)?
MilestoneDate(OKGEMS: S2.b Cluster plan for VLANs between testbeds)?
MilestoneDate(OKGEMS: S2.c Integrate lab sensor nodes)?
MilestoneDate(OKGEMS: S2.d Integrate field sensor nodes)?
MilestoneDate(OKGEMS: S2.e Plan to integrate robotic nodes)?
MilestoneDate(OKGEMS: S2.f Move broker to clearinghouse)?
MilestoneDate(OKGEMS: S2.g Contribution to GENI outreach)?

Project Technical Documents

Quarterly Status Reports

4Q09 Status Report
1Q10 Status Report
2Q10 Status Report

Spiral 2 Connectivity