Version 5 (modified by 12 years ago) (diff) | ,
---|
Project Number
1868
Project Title
GENI Openflow Training for Network Administrators
a.k.a. OFTRAIN
Technical Contacts
PI: Matt Davy, Indiana University, mpd@indiana.edu
Participating Organizations
Indiana University
GPO Liaison System Engineer
GPO System Engineer: Heidi Dempsey
Scope
This project will develop material for a 2-day hands-on workshop on GENI and OpenFlow targeted primarily at network administrators for university campuses and regional networks, and run this workshop repeatedly at major operator conferences (Joint Techs) and at the IU GlobalNOC education lab. The objectives are to: (1) Demonstrate to network administrators that OpenFlow is stable and can be run in parallel with production traffic, (2) Give network administrators a firm understanding of OpenFlow so they are comfortable with supporting it on their production networks, and (3) Help network administrators understand the potential value of OpenFlow and GENI on their networks.
Current Capabilities
BRIEF descriptions of resources/functions/tools that are available to anyone in the GENI community
Milestones
Spiral 4
- MilestoneDate(OFTRAIN: S4.a Develop and post training material)?
- MilestoneDate(OFTRAIN: S4.b Host workshop)?
- MilestoneDate(OFTRAIN: S4.b.1 Host workshop)?
- MilestoneDate(OFTRAIN: S4.c Revise and update training material)?
Project Technical Documents
Links to wiki pages for the project's technical documents go here. List should include any document in the working groups, as well as other useful documents. Projects may have a full tree of wiki pages here.
Post-GEC Status Reports
Status report for 1-Oct-2011 through 2-Apr-2012
Spiral 2 Connectivity
Links to wiki pages about details of infrastrcture that the project is using (if any). Examples include IP addresses, hostnames, URLs, DNS servers, local site network maps, VLANIDs (if permanent VLANs are used), pointers to public keys. GPO may do first drafts of any of these and have the PI correct them to bootstrap. May also include ticket links for pending or known connectivity issues. Many projects will have a full tree of wiki pages here.
Related Projects
Project-Name Includes non-GENI projects.
Attachments (4)
-
OFTRAIN Project Status Report Oct 23 - March 19.pdf (40.4 KB) - added by 11 years ago.
OFTRAIN Project Status Report 25-Oct-2012 to 19-Mar-2013
-
OFTRAIN Project Status Report 23 july - Oct 23.pdf (38.3 KB) - added by 11 years ago.
OFTRAIN Project Status Report 23-July-2012 to 25-October-2012
-
OFTRAIN Project Status Report March 19 - July 21.pdf (39.6 KB) - added by 11 years ago.
OFTRAIN Project Status Report 19-March-2013 to 21-July-2013
-
Dante OF training Nov 2012 slides.gslides (203 bytes) - added by 11 years ago.
Updated Training Material
Download all attachments as: .zip